Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,872
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
ME0250 # 11 Y:1998 | 11 | 1998 | INSULATE BARE EQUIPMENT | $427 | $0 | Implemented |
SF0143 # 01 Y:1998 | 01 | 1998 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $3,365 | $0 | Implemented |
SF0143 # 02 Y:1998 | 02 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,986 | $0 | Implemented |
SF0143 # 03 Y:1998 | 03 | 1998 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $367 | $0 | Implemented |
SF0143 # 04 Y:1998 | 04 | 1998 | USE PHOTOCELL CONTROLS | $6,026 | $2,250 | Implemented |
SF0143 # 05 Y:1998 | 05 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,067 | $4,684 | Implemented |
SF0143 # 06 Y:1998 | 06 | 1998 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $78,251 | $99,600 | Implemented |
SF0143 # 07 Y:1998 | 07 | 1998 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,701 | $9,000 | Implemented |
SF0143 # 08 Y:1998 | 08 | 1998 | INSULATE BARE EQUIPMENT | $468 | $1,138 | Implemented |
SF0143 # 09 Y:1998 | 09 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,201 | $34,990 | Not Implemented |
SF0143 # 10 Y:1998 | 10 | 1998 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $687 | $2,174 | Not Implemented |
WI0326 # 01 Y:1998 | 01 | 1998 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $52,640 | $25,000 | Not Implemented |
WI0326 # 02 Y:1998 | 02 | 1998 | USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL | $43,913 | $40,000 | Not Implemented |
WI0326 # 03 Y:1998 | 03 | 1998 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $11,269 | $20,000 | Not Implemented |
WI0326 # 04 Y:1998 | 04 | 1998 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $7,874 | $12,186 | Not Implemented |
WI0326 # 05 Y:1998 | 05 | 1998 | USE A RAG RECYCLE SERVICE | $4,430 | $0 | Not Implemented |
WI0326 # 06 Y:1998 | 06 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,348 | $12,500 | Not Implemented |
WI0326 # 07 Y:1998 | 07 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,948 | $740 | Not Implemented |
WI0326 # 08 Y:1998 | 08 | 1998 | INSTALL TIMERS AND/OR THERMOSTATS | $504 | $400 | Not Implemented |
WI0326 # 09 Y:1998 | 09 | 1998 | INSULATE BARE EQUIPMENT | $321 | $46 | Not Implemented |
WI0326 # 10 Y:1998 | 10 | 1998 | REMOVE SLUDGE FROM TANKS ON A REGULAR BASIS | $300 | $0 | Not Implemented |
CO0420 # 01 Y:1998 | 01 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,225 | $29,780 | Implemented |
CO0420 # 02 Y:1998 | 02 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,550 | $11,840 | Implemented |
CO0420 # 03 Y:1998 | 03 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,310 | $330 | Implemented |
CO0420 # 04 Y:1998 | 04 | 1998 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $1,020 | $0 | Not Implemented |