IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,105

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TA0055 # 08 Y:2003 08 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $535 $985 Not Implemented
TA0055 # 09 Y:2003 09 2003 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $290 $0 Not Implemented
TA0055 # 10 Y:2003 10 2003 COVER OPEN TANKS $100 $0 Implemented
SD0322 # 01 Y:2003 01 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $24,193 $0 Not Implemented
SD0322 # 02 Y:2003 02 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $12,151 $6,000 Not Implemented
SD0322 # 03 Y:2003 03 2003 INSTALL SKYLIGHTS $4,917 $6,000 Not Implemented
SD0322 # 04 Y:2003 04 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $5,952 $0 Implemented
SD0322 # 05 Y:2003 05 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,614 $2,250 Not Implemented
SD0322 # 06 Y:2003 06 2003 INSULATE BARE EQUIPMENT $579 $350 Not Implemented
SD0322 # 07 Y:2003 07 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,321 $240 Implemented
SD0322 # 08 Y:2003 08 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,814 $5,000 Not Implemented
SD0322 # 09 Y:2003 09 2003 CLEAR AND RENT EXISTING SPACE $238,320 $11,000 Not Implemented
IC0060 # 03 Y:2003 03 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,390 $20,640 Implemented
IC0060 # 04 Y:2003 04 2003 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) $163,590 $170,491 Implemented
IC0060 # 05 Y:2003 05 2003 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $92,294 $190,000 Not Implemented
IC0060 # 06 Y:2003 06 2003 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $9,196 $22,867 Not Implemented
IC0060 # 07 Y:2003 07 2003 REPAIR AND ELIMINATE STEAM LEAKS $11,372 $5,850 Implemented
IC0060 # 08 Y:2003 08 2003 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $7,439 $6,850 Not Implemented
IC0060 # 09 Y:2003 09 2003 RECOVER WASTE HEAT FROM EQUIPMENT $17,626 $13,998 Implemented
IC0060 # 10 Y:2003 10 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,705 $11,354 Implemented
IC0060 # 01 Y:2003 01 2003 REPAIR AND ELIMINATE STEAM LEAKS $148,006 $13,000 Implemented
IC0060 # 02 Y:2003 02 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $8,832 $13,240 Implemented
AS0353 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $892 $4,873 Not Implemented
AS0353 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $42,103 $570 Implemented
AS0353 # 03 Y:2003 03 2003 USE SYNTHETIC LUBRICANT $1,388 $2,160 Implemented