Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
84,208
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0322 # 08 Y:2003 | 08 | 2003 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $2,814 | $5,000 | Not Implemented |
SD0322 # 09 Y:2003 | 09 | 2003 | CLEAR AND RENT EXISTING SPACE | $238,320 | $11,000 | Not Implemented |
TA0055 # 01 Y:2003 | 01 | 2003 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $68,000 | $0 | Implemented |
TA0055 # 02 Y:2003 | 02 | 2003 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $36,000 | $31,820 | Implemented |
TA0055 # 03 Y:2003 | 03 | 2003 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $14,100 | $46 | Implemented |
TA0055 # 04 Y:2003 | 04 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,400 | $910 | Implemented |
TA0055 # 05 Y:2003 | 05 | 2003 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $9,360 | $0 | Implemented |
TA0055 # 06 Y:2003 | 06 | 2003 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $5,260 | $2,000 | Not Implemented |
TA0055 # 07 Y:2003 | 07 | 2003 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $1,675 | $1,000 | Implemented |
TA0055 # 08 Y:2003 | 08 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $535 | $985 | Not Implemented |
TA0055 # 09 Y:2003 | 09 | 2003 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $290 | $0 | Not Implemented |
TA0055 # 10 Y:2003 | 10 | 2003 | COVER OPEN TANKS | $100 | $0 | Implemented |
IC0060 # 01 Y:2003 | 01 | 2003 | REPAIR AND ELIMINATE STEAM LEAKS | $148,006 | $13,000 | Implemented |
IC0060 # 02 Y:2003 | 02 | 2003 | INSTALL / REPAIR INSULATION ON STEAM LINES | $8,832 | $13,240 | Implemented |
IC0060 # 03 Y:2003 | 03 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $8,390 | $20,640 | Implemented |
IC0060 # 04 Y:2003 | 04 | 2003 | USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) | $163,590 | $170,491 | Implemented |
IC0060 # 05 Y:2003 | 05 | 2003 | USE STEAM PRESSURE REDUCTION TO GENERATE POWER | $92,294 | $190,000 | Not Implemented |
IC0060 # 06 Y:2003 | 06 | 2003 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $9,196 | $22,867 | Not Implemented |
IC0060 # 07 Y:2003 | 07 | 2003 | REPAIR AND ELIMINATE STEAM LEAKS | $11,372 | $5,850 | Implemented |
IC0060 # 08 Y:2003 | 08 | 2003 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $7,439 | $6,850 | Not Implemented |
IC0060 # 09 Y:2003 | 09 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $17,626 | $13,998 | Implemented |
IC0060 # 10 Y:2003 | 10 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,705 | $11,354 | Implemented |
AS0353 # 01 Y:2003 | 01 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $892 | $4,873 | Not Implemented |
AS0353 # 02 Y:2003 | 02 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $42,103 | $570 | Implemented |
AS0353 # 03 Y:2003 | 03 | 2003 | USE SYNTHETIC LUBRICANT | $1,388 | $2,160 | Implemented |