IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,394

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0080 # 03 Y:2004 03 2004 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $93,161 $57,760 Not Implemented
MI0080 # 04 Y:2004 04 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,222 $160 Implemented
MI0080 # 05 Y:2004 05 2004 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $822 $60 Implemented
NC0285 # 01 Y:2004 01 2004 RECOVER AND REUSE COOLING WATER $84,488 $67,500 Not Implemented
NC0285 # 02 Y:2004 02 2004 RECOVER AND REUSE COOLING WATER $7,258 $8,763 Not Implemented
NC0285 # 03 Y:2004 03 2004 RECOVER AND REUSE COOLING WATER $29,869 $5,075 Not Implemented
NC0285 # 04 Y:2004 04 2004 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $956 $1,380 Not Implemented
NC0285 # 05 Y:2004 05 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $48,918 $20,000 Not Implemented
NC0285 # 06 Y:2004 06 2004 ADJUST BURNERS FOR EFFICIENT OPERATION $9,991 $1,000 Not Implemented
NC0285 # 07 Y:2004 07 2004 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $11,507 $23,675 Not Implemented
NC0285 # 08 Y:2004 08 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,454 $500 Not Implemented
LE0188 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,732 $1,000 Not Implemented
LE0188 # 02 Y:2004 02 2004 OPTIMIZE PLANT POWER FACTOR $9,843 $17,200 Implemented
LE0188 # 03 Y:2004 03 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,132 $8,028 Not Implemented
LE0188 # 04 Y:2004 04 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,694 $2,500 Implemented
LE0188 # 05 Y:2004 05 2004 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING $3,459 $1,200 Not Implemented
LE0188 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,947 $11,665 Implemented
LE0188 # 07 Y:2004 07 2004 INSTALL OCCUPANCY SENSORS $1,782 $3,900 Implemented
IA0342 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $775 $344 Implemented
IA0342 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,335 $31,871 Not Implemented
IA0342 # 03 Y:2004 03 2004 INSTALL OCCUPANCY SENSORS $1,094 $888 Implemented
IA0342 # 04 Y:2004 04 2004 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $1,701 $1,500 Implemented
IA0342 # 05 Y:2004 05 2004 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $10,625 $538 Not Implemented
IA0342 # 06 Y:2004 06 2004 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $7,150 $715 Implemented
LE0187 # 01 Y:2004 01 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $18,829 $10,000 Not Implemented