IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

576

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0151 # 03 Y:1996 03 1996 INSTALL TIMERS AND/OR THERMOSTATS $795 $600 Not Implemented
SD0151 # 04 Y:1996 04 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,233 $440 Implemented
SD0151 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,509 $3,663 Implemented
SD0151 # 06 Y:1996 06 1996 INSTALL SPECTRAL REFLECTORS / DELAMP $4,479 $5,640 Implemented
SD0151 # 07 Y:1996 07 1996 INSTALL OCCUPANCY SENSORS $426 $369 Implemented
SD0151 # 08 Y:1996 08 1996 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $2,885 $1,450 Implemented
SD0151 # 09 Y:1996 09 1996 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $91 $200 Implemented
SD0150 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $18,102 $21,570 Implemented
SD0150 # 02 Y:1996 02 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,242 $3,920 Implemented
SD0150 # 03 Y:1996 03 1996 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $10,042 $4,160 Implemented
SD0150 # 04 Y:1996 04 1996 INSTALL / REPAIR INSULATION ON STEAM LINES $2,408 $3,077 Implemented
SD0150 # 05 Y:1996 05 1996 RECOVER WASTE HEAT FROM EQUIPMENT $7,368 $5,825 Not Implemented
SD0150 # 06 Y:1996 06 1996 MINIMIZE WATER USAGE $7,565 $3,410 Implemented
SD0150 # 07 Y:1996 07 1996 USE PRECIPITATING AGENTS IN WASTE WATER TREATMENT THAT PRODUCE THE LEAST QUANTITY OF WASTE $34,791 $5,000 Implemented
SF0089 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $875 $729 Implemented
SF0089 # 02 Y:1996 02 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $794 $462 Implemented
SF0089 # 03 Y:1996 03 1996 INSTALL OCCUPANCY SENSORS $301 $960 Not Implemented
SF0089 # 04 Y:1996 04 1996 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $7,998 $13,780 Not Implemented
SF0089 # 05 Y:1996 05 1996 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,869 $0 Implemented
SF0089 # 06 Y:1996 06 1996 INSULATE BARE EQUIPMENT $649 $558 Not Implemented
SF0089 # 07 Y:1996 07 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,018 $1,475 Not Implemented
SF0089 # 08 Y:1996 08 1996 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $1,670 $2,818 Not Implemented
SF0089 # 09 Y:1996 09 1996 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $5,899 $6,395 Not Implemented
SF0089 # 10 Y:1996 10 1996 METER WASTE WATER $14,295 $4,500 Not Implemented
SD0149 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,319 $3,090 Not Implemented