IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,874

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0714 # 04 Y:2015 04 2015 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $9,310 $36,000 n/a
CO0714 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,690 $41,900 n/a
CO0713 # 01 Y:2015 01 2015 AVOID FROST FORMATION ON EVAPORATORS $4,350 $5,740 n/a
CO0713 # 02 Y:2015 02 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,340 $4,650 n/a
CO0713 # 03 Y:2015 03 2015 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,930 $3,620 n/a
CO0713 # 04 Y:2015 04 2015 INSULATE BARE EQUIPMENT $290 $220 n/a
CO0713 # 05 Y:2015 05 2015 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $8,650 $500 n/a
CO0713 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,400 $18,930 n/a
CO0712 # 01 Y:2015 01 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,140 $22,400 n/a
CO0712 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,050 $1,000 n/a
CO0712 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,180 $7,940 n/a
CO0711 # 01 Y:2015 01 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,360 $620 n/a
CO0711 # 02 Y:2015 02 2015 INSULATE BARE EQUIPMENT $900 $960 n/a
CO0711 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $350 $340 n/a
CO0711 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,960 $15,540 n/a
CO0710 # 01 Y:2015 01 2015 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,950 $3,660 Not Implemented
CO0710 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,710 $340 Implemented
CO0710 # 03 Y:2015 03 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $470 $60 Implemented
CO0710 # 04 Y:2015 04 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $370 $1,170 Not Implemented
CO0709 # 01 Y:2015 01 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,310 $1,000 Implemented
CO0709 # 02 Y:2015 02 2015 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $960 $630 Not Implemented
CO0709 # 03 Y:2015 03 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $840 $1,110 Not Implemented
CO0709 # 04 Y:2015 04 2015 AVOID FROST FORMATION ON EVAPORATORS $380 $1,960 Not Implemented
CO0709 # 05 Y:2015 05 2015 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $260 $590 Not Implemented
CO0709 # 06 Y:2015 06 2015 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $4,560 $500 Implemented