IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,713

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0604 # 05 Y:2023 05 2023 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $2,430 $780 Implemented
UF0604 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,334 $6,383 Not Implemented
UF0604 # 07 Y:2023 07 2023 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $63,559 $10,000 Implemented
UF0604 # 08 Y:2023 08 2023 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $10,959 $0 Implemented
MI0430 # 01 Y:2023 01 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $25,630 $580 Implemented
MI0430 # 02 Y:2023 02 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,475 $1,920 Not Implemented
MI0430 # 03 Y:2023 03 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $3,086 $3,360 Not Implemented
MI0430 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,567 $3,751 Not Implemented
MI0430 # 05 Y:2023 05 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,834 $7,288 Implemented
MI0430 # 06 Y:2023 06 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,813 $470 Implemented
MI0430 # 07 Y:2023 07 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,292 $1,980 Implemented
MI0429 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $172,404 $974,914 Not Implemented
MI0429 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $31,739 $1,660 Implemented
MI0429 # 03 Y:2023 03 2023 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $25,267 $0 Not Implemented
MI0429 # 04 Y:2023 04 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $16,344 $70,840 Not Implemented
MI0429 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,166 $12,997 Implemented
MI0429 # 06 Y:2023 06 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,831 $6,950 Not Implemented
MI0429 # 07 Y:2023 07 2023 USE SOLAR HEAT TO HEAT WATER $1,687 $8,166 Not Implemented
MI0429 # 08 Y:2023 08 2023 INSULATE BARE EQUIPMENT $1,608 $1,012 Not Implemented
UF0602 # 01 Y:2023 01 2023 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $848,231 $3,118,500 Not Implemented
UF0602 # 02 Y:2023 02 2023 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $389,519 $50,482 Implemented
UF0602 # 03 Y:2023 03 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $339,285 $786,250 Implemented
UF0602 # 04 Y:2023 04 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $268,820 $137,250 Implemented
UF0602 # 05 Y:2023 05 2023 MAKE ICE DURING OFF PEAK HOURS FOR COOLING $117,532 $250,000 Not Implemented
UF0602 # 06 Y:2023 06 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $72,743 $322,608 Not Implemented