IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

504

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0135 # 17 Y:1984 17 1984 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,359 $3,150 Not Implemented
KU0135 # 18 Y:1984 18 1984 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,061 $1,400 Not Implemented
KU0135 # 19 Y:1984 19 1984 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $905 $300 Implemented
KU0135 # 20 Y:1984 20 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $496 $400 Not Implemented
KU0135 # 21 Y:1984 21 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $495 $0 Not Implemented
KU0135 # 22 Y:1984 22 1984 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $368 $10 Implemented
KU0136 # 01 Y:1984 01 1984 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $22,674 $18,773 Not Implemented
KU0136 # 02 Y:1984 02 1984 OPTIMIZE PLANT POWER FACTOR $14,985 $22,000 Not Implemented
KU0136 # 03 Y:1984 03 1984 USE DEMAND CONTROLLER OR LOAD SHEDDER $4,614 $6,500 Not Implemented
KU0136 # 04 Y:1984 04 1984 INSTALL TIMERS AND/OR THERMOSTATS $14,206 $69 Not Implemented
KU0136 # 05 Y:1984 05 1984 INSTALL TIMERS AND/OR THERMOSTATS $4,034 $342 Not Implemented
KU0136 # 06 Y:1984 06 1984 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $1,779 $0 Not Implemented
KU0136 # 07 Y:1984 07 1984 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,567 $176 Implemented
KU0136 # 08 Y:1984 08 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,972 $0 Not Implemented
KU0136 # 09 Y:1984 09 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,693 $0 Not Implemented
KU0136 # 10 Y:1984 10 1984 INSTALL AUTOMATIC STACK DAMPER $2,814 $1,350 Not Implemented
KU0129 # 01 Y:1984 01 1984 IMPROVE LUBRICATION PRACTICES $15,682 $1,300 Not Implemented
KU0129 # 02 Y:1984 02 1984 RECOVER WASTE HEAT FROM EQUIPMENT $8,014 $6,400 Not Implemented
KU0129 # 03 Y:1984 03 1984 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $3,368 $3,000 Implemented
KU0129 # 04 Y:1984 04 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,366 $0 Implemented
KU0129 # 05 Y:1984 05 1984 INSTALL TURBULATORS $7,337 $2,000 Implemented
KU0129 # 06 Y:1984 06 1984 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $4,922 $3,000 Implemented
KU0129 # 07 Y:1984 07 1984 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,524 $8,000 Not Implemented
KU0129 # 08 Y:1984 08 1984 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $1,411 $1,330 Not Implemented
KU0129 # 09 Y:1984 09 1984 INCREASE AMOUNT OF CONDENSATE RETURNED $2,264 $2,500 Implemented