IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

998

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0324 # 10 Y:2002 10 2002 CLEAR AND RENT EXISTING SPACE $53,920 $5,308 Not Implemented
AS0323 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $23,932 $220 Implemented
AS0323 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,163 $3,020 Not Implemented
AS0323 # 03 Y:2002 03 2002 INSTALL OCCUPANCY SENSORS $276 $375 Not Implemented
AS0323 # 04 Y:2002 04 2002 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $6,114 $540 Not Implemented
AS0323 # 05 Y:2002 05 2002 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $633 $0 Implemented
AS0323 # 06 Y:2002 06 2002 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,096 $2,100 Not Implemented
AS0323 # 07 Y:2002 07 2002 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $1,800 $154 Implemented
AS0323 # 08 Y:2002 08 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $29,052 $6,600 Implemented
AS0323 # 09 Y:2002 09 2002 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $109,188 $7,050 Implemented
NV0169 # 01 Y:2000 01 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $16,388 $5,060 Not Implemented
NV0169 # 02 Y:2000 02 2000 INSTALL SKYLIGHTS $13,086 $25,700 Not Implemented
NV0169 # 03 Y:2000 03 2000 INSTALL / REPAIR INSULATION ON STEAM LINES $865 $620 Not Implemented
NV0169 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $308 $661 Implemented
NV0169 # 05 Y:2000 05 2000 INSTALL AN UNINTERUPTABLE POWER SUPPLY $164,384 $1,250 Not Implemented
NV0169 # 06 Y:2000 06 2000 ELIMINATE/REDUCE REDUNDANT INSPECTIONS $13,013 $1,000 Not Implemented
NV0166 # 01 Y:2000 01 2000 AIR CONDITION ONLY SPACE NECESSARY $32,352 $17,000 n/a
NV0166 # 02 Y:2000 02 2000 INSTALL OCCUPANCY SENSORS $321 $255 n/a
NV0166 # 03 Y:2000 03 2000 RECOVER WASTE HEAT FROM EQUIPMENT $180 $194 n/a
NV0166 # 04 Y:2000 04 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $81 $0 n/a
NV0166 # 05 Y:2000 05 2000 AUTOMATE FINISHING PROCESS $195,000 $3,465 n/a
NV0164 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $95,346 $200 n/a
NV0164 # 02 Y:2000 02 2000 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $75,664 $100 n/a
NV0164 # 03 Y:2000 03 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $21,258 $0 n/a
NV0164 # 04 Y:2000 04 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,704 $150 n/a