IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,520

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL0233 # 06 Y:1999 06 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $10,120 $0 Not Implemented
UL0237 # 01 Y:1999 01 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,611 $100 Not Implemented
UL0237 # 02 Y:1999 02 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $11,512 $0 Implemented
UL0237 # 03 Y:1999 03 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $5,309 $0 Not Implemented
NV0142 # 01 Y:1999 01 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,150 $12,127 Implemented
NV0142 # 02 Y:1999 02 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $414 $270 Not Implemented
NV0142 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $525 $0 Implemented
NV0142 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,122 $30,600 Implemented
GT0679 # 01 Y:1999 01 1999 COMBINE UTILITY METERS $1,400 $0 Not Implemented
GT0679 # 02 Y:1999 02 1999 CONVERT COMBUSTION EQUIPMENT TO BURN OIL $27,261 $5,000 Not Implemented
GT0679 # 03 Y:1999 03 1999 REPAIR AND ELIMINATE STEAM LEAKS $1,157 $200 Implemented
GT0679 # 04 Y:1999 04 1999 INSULATE FEEDWATER TANK $4,877 $5,350 Implemented
GT0679 # 05 Y:1999 05 1999 CLOSE OFF UNNEEDED STEAM LINES $164 $50 Implemented
GT0679 # 06 Y:1999 06 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,006 $46,917 Not Implemented
GT0679 # 07 Y:1999 07 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $5,625 $14,270 Not Implemented
KU0534 # 01 Y:1999 01 1999 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,860 $1,000 Not Implemented
KU0534 # 02 Y:1999 02 1999 MINIMIZE WATER USAGE $84,000 $22,000 Not Implemented
KU0534 # 03 Y:1999 03 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $9,920 $1,360 Not Implemented
UL0234 # 01 Y:1999 01 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,233 $20 Not Implemented
UL0234 # 02 Y:1999 02 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $480 $131 Not Implemented
UL0234 # 03 Y:1999 03 1999 INSTALL REDUNDANT EQUIPMENT TO AVOID LOSSES CAUSED BY EQUIPMENT FAILURE AND ROUTINE MAINTENANCE $11,305 $800 Not Implemented
UL0234 # 04 Y:1999 04 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $4,824 $0 Not Implemented
UL0234 # 05 Y:1999 05 1999 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $62,180 $300 Implemented
NV0141 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $258 $562 Not Implemented
NV0141 # 02 Y:1999 02 1999 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,845 $2,532 Implemented