IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,715

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0767 # 06 Y:2016 06 2016 INSTALL / REPAIR INSULATION ON STEAM LINES $361 $274 Implemented
MA0768 # 01 Y:2016 01 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,870 $3,830 Not Implemented
MA0768 # 02 Y:2016 02 2016 INSTALL / REPAIR INSULATION ON STEAM LINES $939 $3,914 Implemented
MA0768 # 03 Y:2016 03 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $871 $1,000 Implemented
MA0768 # 04 Y:2016 04 2016 MINIMIZE WATER USAGE $587 $3,650 Implemented
MA0768 # 05 Y:2016 05 2016 OPTIMIZE PLANT POWER FACTOR $515 $3,480 Not Implemented
MA0768 # 06 Y:2016 06 2016 CLOSE OFF UNNEEDED STEAM LINES $376 $4,348 Implemented
MA0768 # 07 Y:2016 07 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $331 $2,648 Not Implemented
MA0768 # 08 Y:2016 08 2016 INSTALL / REPAIR INSULATION ON STEAM LINES $313 $1,944 Implemented
MA0768 # 09 Y:2016 09 2016 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $122 $300 Not Implemented
OK0956 # 01 Y:2016 01 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,844 $7,700 Not Implemented
OK0956 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,155 $2,536 Not Implemented
OK0956 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,914 $51,634 Not Implemented
OK0956 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,000 $1,488 Not Implemented
OK0956 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,910 $3,000 Not Implemented
OK0956 # 06 Y:2016 06 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $492 $1,325 Not Implemented
OK0956 # 07 Y:2016 07 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,027 $34,182 Not Implemented
OK0956 # 08 Y:2016 08 2016 INSULATE BARE EQUIPMENT $145 $180 Not Implemented
OK0956 # 09 Y:2016 09 2016 INSTALL SET-BACK TIMERS $237 $50 Not Implemented
BS0090 # 01 Y:2016 01 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $2,027 $1,820 Implemented
BS0090 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,391 $2,653 Implemented
BS0090 # 03 Y:2016 03 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,077 $2,600 Not Implemented
BS0090 # 04 Y:2016 04 2016 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $942 $1,373 Implemented
BS0090 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $395 $254 Implemented
BS0090 # 06 Y:2016 06 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $283 $274 Not Implemented