IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,573

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL0221 # 03 Y:1999 03 1999 METER WASTE WATER $1,766 $677 Not Implemented
UL0221 # 04 Y:1999 04 1999 INSTALL AN UNINTERUPTABLE POWER SUPPLY $1,999,760 $1,034,600 Not Implemented
UL0221 # 05 Y:1999 05 1999 INSTALL EQUIPMENT TO MOVE PRODUCT $21,950 $20,120 Not Implemented
UL0219 # 01 Y:1999 01 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $563 $20 Implemented
UL0219 # 02 Y:1999 02 1999 OPTIMIZE PLANT POWER FACTOR $8,356 $24,627 Implemented
UL0219 # 03 Y:1999 03 1999 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $191 $0 Implemented
UL0219 # 04 Y:1999 04 1999 METER WASTE WATER $4,053 $0 Implemented
UL0219 # 05 Y:1999 05 1999 CLEAR AND RENT EXISTING SPACE $2,520 $300 Implemented
UL0219 # 06 Y:1999 06 1999 MODIFY CURRENT INCENTIVE PROGRAM $4,514 $60 Implemented
ND0319 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,025 $10,705 Not Implemented
ND0319 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $63 $65 Implemented
ND0319 # 03 Y:1999 03 1999 INSTALL SKYLIGHTS $535 $420 Not Implemented
ND0319 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $411 $30 Implemented
ND0319 # 05 Y:1999 05 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $380 $440 Not Implemented
ND0319 # 06 Y:1999 06 1999 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $155 $40 Implemented
ND0319 # 07 Y:1999 07 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $283 $510 Implemented
ND0319 # 08 Y:1999 08 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $269 $450 Not Implemented
UL0216 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,573 $13,951 Not Implemented
UL0216 # 02 Y:1999 02 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,059 $20 Not Implemented
UL0216 # 03 Y:1999 03 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $160 $500 Not Implemented
UL0216 # 04 Y:1999 04 1999 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM $200,000 $75,000 Not Implemented
ND0317 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,051 $1,500 Not Implemented
ND0317 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,579 $7,583 Not Implemented
ND0317 # 03 Y:1999 03 1999 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $273 $60 Implemented
ND0317 # 04 Y:1999 04 1999 INSTALL OCCUPANCY SENSORS $826 $1,200 Not Implemented