Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,640
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0614 # 02 Y:2001 | 02 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,500 | $6,100 | Not Implemented |
OK0614 # 03 Y:2001 | 03 | 2001 | INSULATE BARE EQUIPMENT | $5,656 | $9,700 | Implemented |
OK0614 # 04 Y:2001 | 04 | 2001 | INSTALL OCCUPANCY SENSORS | $377 | $3,700 | Not Implemented |
OK0614 # 05 Y:2001 | 05 | 2001 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $9,100 | $4,000 | Implemented |
SF0215 # 01 Y:2001 | 01 | 2001 | APPLY A PROTECTIVE COATING TO RACKS AND TANKS | $3,452 | $0 | Implemented |
SF0215 # 02 Y:2001 | 02 | 2001 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $9,984 | $4,574 | Implemented |
SF0215 # 03 Y:2001 | 03 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,711 | $1,366 | Not Implemented |
SF0215 # 04 Y:2001 | 04 | 2001 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $12,982 | $13,500 | Not Implemented |
SF0215 # 05 Y:2001 | 05 | 2001 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $46,103 | $50,000 | Implemented |
SF0215 # 06 Y:2001 | 06 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,758 | $3,291 | Implemented |
SF0215 # 07 Y:2001 | 07 | 2001 | INSTALL OCCUPANCY SENSORS | $6,547 | $14,341 | Implemented |
SF0215 # 08 Y:2001 | 08 | 2001 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $5,806 | $14,760 | n/a |
SF0215 # 09 Y:2001 | 09 | 2001 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,329 | $3,400 | Not Implemented |
SF0215 # 10 Y:2001 | 10 | 2001 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $33,374 | $128,000 | n/a |
SF0215 # 11 Y:2001 | 11 | 2001 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $219,121 | $0 | Implemented |
SF0215 # 12 Y:2001 | 12 | 2001 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $3,216 | $0 | Not Implemented |
SF0215 # 13 Y:2001 | 13 | 2001 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $461,186 | $60,000 | n/a |
SF0215 # 14 Y:2001 | 14 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $139,058 | $35,200 | n/a |
SF0215 # 15 Y:2001 | 15 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $5,003 | $5,111 | Implemented |
LM0006 # 01 Y:2001 | 01 | 2001 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $14,800 | $225 | Not Implemented |
LM0006 # 02 Y:2001 | 02 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,389 | $450 | Implemented |
LM0006 # 03 Y:2001 | 03 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,601 | $0 | Not Implemented |
LM0006 # 04 Y:2001 | 04 | 2001 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $8,671 | $13,000 | Not Implemented |
LM0006 # 05 Y:2001 | 05 | 2001 | INSTALL SKYLIGHTS | $952 | $2,000 | Not Implemented |
LM0006 # 06 Y:2001 | 06 | 2001 | MODIFY STARTUP/SHUTDOWN TIMES | $11,340 | $1,000 | Not Implemented |