IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,703

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0256 # 06 Y:2014 06 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,634 $80 Implemented
MI0256 # 07 Y:2014 07 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,540 $3,240 Not Implemented
MI0256 # 08 Y:2014 08 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,517 $3,360 Not Implemented
MI0256 # 09 Y:2014 09 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,183 $6,800 Not Implemented
WM0042 # 01 Y:2014 01 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,231 $300 Implemented
WM0042 # 02 Y:2014 02 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $734 $288 Not Implemented
WM0042 # 03 Y:2014 03 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $501 $0 Not Implemented
WM0042 # 04 Y:2014 04 2014 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,034 $2,340 Not Implemented
WM0042 # 05 Y:2014 05 2014 USE SYNTHETIC LUBRICANT $3,625 $2,066 Not Implemented
WM0042 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,162 $9,680 Implemented
WM0042 # 07 Y:2014 07 2014 INSTALL OCCUPANCY SENSORS $322 $340 Implemented
BD0442 # 01 Y:2014 01 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $16,957 $8,000 Not Implemented
BD0442 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,866 $17,640 Not Implemented
BD0442 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $724 $600 Not Implemented
NC0508 # 01 Y:2014 01 2014 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $9,684 $2,200 Implemented
NC0508 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $865 $100 Implemented
NC0508 # 03 Y:2014 03 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,274 $1,950 Not Implemented
NC0508 # 04 Y:2014 04 2014 RECOVER WASTE HEAT FROM EQUIPMENT $1,952 $2,300 Implemented
NC0508 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,695 $28,977 Implemented
NC0508 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $520 $4,006 Not Implemented
NC0508 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,026 $240 Implemented
NC0508 # 08 Y:2014 08 2014 INSTALL OCCUPANCY SENSORS $359 $574 Not Implemented
NC0508 # 09 Y:2014 09 2014 DEVELOP A REPAIR/REPLACE POLICY $1,128 $4,256 Not Implemented
CO0684 # 01 Y:2014 01 2014 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,830 $3,600 Not Implemented
CO0684 # 02 Y:2014 02 2014 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $920 $2,600 Not Implemented