IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,715

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0083 # 05 Y:2016 05 2016 INSULATE BARE EQUIPMENT $12,261 $1,680 Not Implemented
WM0083 # 06 Y:2016 06 2016 INSTALL OCCUPANCY SENSORS $1,673 $1,425 Implemented
WM0083 # 07 Y:2016 07 2016 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,105 $2,490 Implemented
WM0083 # 08 Y:2016 08 2016 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $273 $695 Not Implemented
UD0944 # 01 Y:2016 01 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,720 $7,315 Not Implemented
UD0944 # 02 Y:2016 02 2016 INSULATE BARE EQUIPMENT $749 $2,640 Not Implemented
UD0944 # 03 Y:2016 03 2016 INSULATE BARE EQUIPMENT $476 $1,148 Not Implemented
UD0944 # 04 Y:2016 04 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $424 $0 Not Implemented
CO0720 # 01 Y:2016 01 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $14,640 $62,670 Not Implemented
CO0720 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,840 $300 Implemented
CO0720 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,190 $67,155 Implemented
CO0720 # 04 Y:2016 04 2016 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $5,510 $27,600 Not Implemented
CO0720 # 05 Y:2016 05 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $930 $1,330 Not Implemented
SF0478 # 01 Y:2016 01 2016 USE POWER DURING OFF-PEAK PERIODS $5,976 $0 Implemented
SF0478 # 02 Y:2016 02 2016 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $6,324 $2,354 Implemented
SF0478 # 03 Y:2016 03 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,559 $6,856 Implemented
SF0478 # 04 Y:2016 04 2016 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $3,956 $2,003 Not Implemented
SF0478 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $18,801 $20,415 Implemented
SF0478 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,062 $48,543 Implemented
SF0478 # 07 Y:2016 07 2016 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $323,906 $1,095,380 Implemented
LE0414 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,057 $0 Implemented
LE0414 # 02 Y:2016 02 2016 PREHEAT COMBUSTION AIR WITH WASTE HEAT $34,860 $36,000 Implemented
LE0414 # 03 Y:2016 03 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,251 $1,460 Not Implemented
LE0414 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,088 $14,625 Implemented
LE0414 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,482 $10,500 Implemented