IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,105

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0757 # 03 Y:2003 03 2003 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,064 $948 Implemented
GT0757 # 04 Y:2003 04 2003 INSTALL OCCUPANCY SENSORS $830 $773 Implemented
GT0757 # 05 Y:2003 05 2003 METER WASTE WATER $8,405 $1,932 Not Implemented
GT0757 # 06 Y:2003 06 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,944 $3,598 Implemented
GT0757 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $164 $1,068 Implemented
GT0757 # 08 Y:2003 08 2003 UPGRADE CONTROLS ON COMPRESSORS $10,106 $20,000 Not Implemented
GT0757 # 09 Y:2003 09 2003 PAY UTILITY BILLS ON TIME $3,198 $0 Implemented
AM0439 # 01 Y:2003 01 2003 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $910,000 $435,000 Implemented
AM0439 # 02 Y:2003 02 2003 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $79,200 $1,200 Implemented
AM0439 # 03 Y:2003 03 2003 REDUCE OR ELIMINATE WASTE $36,600 $220 Implemented
AM0439 # 04 Y:2003 04 2003 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $31,700 $270 Implemented
AM0439 # 05 Y:2003 05 2003 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $15,600 $500 Implemented
AM0439 # 06 Y:2003 06 2003 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $13,200 $7,600 Implemented
AM0439 # 07 Y:2003 07 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,400 $1,000 Implemented
AM0439 # 08 Y:2003 08 2003 REPAIR OR REPLACE STEAM TRAPS $7,600 $1,120 Implemented
AM0439 # 09 Y:2003 09 2003 INSULATE BARE EQUIPMENT $4,890 $550 Implemented
AM0439 # 10 Y:2003 10 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,500 $980 Implemented
AM0439 # 11 Y:2003 11 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,290 $1,460 Implemented
AM0439 # 12 Y:2003 12 2003 ELIMINATE LEAKS IN WATER LINES AND VALVES $1,140 $400 Implemented
WI0444 # 01 Y:2003 01 2003 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $6,597 $9,000 Implemented
WI0444 # 02 Y:2003 02 2003 UPGRADE CONTROLS ON COMPRESSORS $4,807 $7,500 Not Implemented
WI0444 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,189 $8,655 Implemented
WI0444 # 04 Y:2003 04 2003 RECOVER WASTE HEAT FROM EQUIPMENT $3,383 $2,000 Not Implemented
WI0444 # 05 Y:2003 05 2003 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,301 $1,424 Not Implemented
WI0444 # 06 Y:2003 06 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $983 $740 Implemented