Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,105
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0757 # 03 Y:2003 | 03 | 2003 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,064 | $948 | Implemented |
GT0757 # 04 Y:2003 | 04 | 2003 | INSTALL OCCUPANCY SENSORS | $830 | $773 | Implemented |
GT0757 # 05 Y:2003 | 05 | 2003 | METER WASTE WATER | $8,405 | $1,932 | Not Implemented |
GT0757 # 06 Y:2003 | 06 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,944 | $3,598 | Implemented |
GT0757 # 07 Y:2003 | 07 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $164 | $1,068 | Implemented |
GT0757 # 08 Y:2003 | 08 | 2003 | UPGRADE CONTROLS ON COMPRESSORS | $10,106 | $20,000 | Not Implemented |
GT0757 # 09 Y:2003 | 09 | 2003 | PAY UTILITY BILLS ON TIME | $3,198 | $0 | Implemented |
AM0439 # 01 Y:2003 | 01 | 2003 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $910,000 | $435,000 | Implemented |
AM0439 # 02 Y:2003 | 02 | 2003 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $79,200 | $1,200 | Implemented |
AM0439 # 03 Y:2003 | 03 | 2003 | REDUCE OR ELIMINATE WASTE | $36,600 | $220 | Implemented |
AM0439 # 04 Y:2003 | 04 | 2003 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $31,700 | $270 | Implemented |
AM0439 # 05 Y:2003 | 05 | 2003 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $15,600 | $500 | Implemented |
AM0439 # 06 Y:2003 | 06 | 2003 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $13,200 | $7,600 | Implemented |
AM0439 # 07 Y:2003 | 07 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,400 | $1,000 | Implemented |
AM0439 # 08 Y:2003 | 08 | 2003 | REPAIR OR REPLACE STEAM TRAPS | $7,600 | $1,120 | Implemented |
AM0439 # 09 Y:2003 | 09 | 2003 | INSULATE BARE EQUIPMENT | $4,890 | $550 | Implemented |
AM0439 # 10 Y:2003 | 10 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,500 | $980 | Implemented |
AM0439 # 11 Y:2003 | 11 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,290 | $1,460 | Implemented |
AM0439 # 12 Y:2003 | 12 | 2003 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $1,140 | $400 | Implemented |
WI0444 # 01 Y:2003 | 01 | 2003 | USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME | $6,597 | $9,000 | Implemented |
WI0444 # 02 Y:2003 | 02 | 2003 | UPGRADE CONTROLS ON COMPRESSORS | $4,807 | $7,500 | Not Implemented |
WI0444 # 03 Y:2003 | 03 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,189 | $8,655 | Implemented |
WI0444 # 04 Y:2003 | 04 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,383 | $2,000 | Not Implemented |
WI0444 # 05 Y:2003 | 05 | 2003 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,301 | $1,424 | Not Implemented |
WI0444 # 06 Y:2003 | 06 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $983 | $740 | Implemented |