Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
8,718
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0290 # 08 Y:2005 | 08 | 2005 | INSTALL OCCUPANCY SENSORS | $530 | $1,000 | Implemented |
BD0290 # 09 Y:2005 | 09 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $429 | $0 | Implemented |
BD0290 # 10 Y:2005 | 10 | 2005 | INSTALL FOSSIL FUEL MAKE-UP AIR UNIT | $396 | $750 | Implemented |
BD0290 # 11 Y:2005 | 11 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $267 | $265 | Implemented |
BD0290 # 12 Y:2005 | 12 | 2005 | USE EVAPORATION TO CONCENTRATE MATERIAL | $2,604 | $2,500 | Not Implemented |
BD0290 # 13 Y:2005 | 13 | 2005 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $1,381 | $700 | Implemented |
BD0290 # 14 Y:2005 | 14 | 2005 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $406 | $450 | Implemented |
BD0290 # 15 Y:2005 | 15 | 2005 | METER WASTE WATER | $728 | $250 | Implemented |
IC0103 # 01 Y:2005 | 01 | 2005 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $12,792 | $12,792 | Not Implemented |
IC0103 # 02 Y:2005 | 02 | 2005 | INSTALL / REPAIR INSULATION ON STEAM LINES | $8,631 | $4,680 | Not Implemented |
IC0103 # 03 Y:2005 | 03 | 2005 | REPAIR AND ELIMINATE STEAM LEAKS | $2,344 | $1,400 | Not Implemented |
IC0103 # 04 Y:2005 | 04 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,340 | $300 | Not Implemented |
IC0103 # 05 Y:2005 | 05 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $240 | $0 | Not Implemented |
IC0103 # 06 Y:2005 | 06 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,336 | $941 | Not Implemented |
IC0103 # 07 Y:2005 | 07 | 2005 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $330 | $2,800 | Not Implemented |
IC0103 # 08 Y:2005 | 08 | 2005 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $104 | $256 | Not Implemented |
BD0286 # 01 Y:2005 | 01 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $140,820 | $28,500 | Implemented |
BD0286 # 02 Y:2005 | 02 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $94,025 | $122,830 | Implemented |
BD0286 # 03 Y:2005 | 03 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $40,515 | $5,400 | Not Implemented |
BD0286 # 04 Y:2005 | 04 | 2005 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $18,974 | $14,000 | Implemented |
BD0286 # 05 Y:2005 | 05 | 2005 | INSTALL OCCUPANCY SENSORS | $9,987 | $2,625 | Implemented |
BD0286 # 06 Y:2005 | 06 | 2005 | INSTALL TURBULATORS | $8,810 | $12,000 | Implemented |
BD0286 # 07 Y:2005 | 07 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,152 | $1,200 | Implemented |
BD0286 # 08 Y:2005 | 08 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,506 | $0 | Implemented |
BD0286 # 09 Y:2005 | 09 | 2005 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,512 | $400 | Not Implemented |