IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,640

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0613 # 01 Y:2001 01 2001 INSTALL SET-BACK TIMERS $10,756 $1,026 Not Implemented
OK0613 # 02 Y:2001 02 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,071 $4,000 Implemented
OK0613 # 03 Y:2001 03 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $456 $2,600 Implemented
OK0613 # 04 Y:2001 04 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $2,475 $7,120 Not Implemented
OK0613 # 05 Y:2001 05 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,508 $6,000 Not Implemented
OK0613 # 06 Y:2001 06 2001 RECOVER AND REUSE WASTE MATERIAL $54,883 $20,680 Not Implemented
OK0613 # 07 Y:2001 07 2001 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,400 $572 Not Implemented
OK0613 # 08 Y:2001 08 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $304 $125 Not Implemented
LE0108 # 01 Y:2001 01 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,746 $2,500 Not Implemented
LE0108 # 02 Y:2001 02 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,248 $0 Implemented
LE0108 # 03 Y:2001 03 2001 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $2,738 $3,120 Implemented
LE0108 # 04 Y:2001 04 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $315 $500 Implemented
AS0297 # 01 Y:2001 01 2001 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $166,920 $35,000 n/a
AS0297 # 02 Y:2001 02 2001 INSTALL SKYLIGHTS $1,527 $3,086 Not Implemented
AS0297 # 03 Y:2001 03 2001 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $520 $240 Not Implemented
AS0297 # 04 Y:2001 04 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $25,657 $90,000 n/a
AS0297 # 05 Y:2001 05 2001 CONTRACT A WOOD PALLET RECYCLING COMPANY $3,360 $60 Not Implemented
AS0297 # 06 Y:2001 06 2001 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $5,712 $5,916 Not Implemented
OR0390 # 01 Y:2001 01 2001 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $79,800 $30,700 Implemented
OR0390 # 02 Y:2001 02 2001 OPTIMIZE PLANT POWER FACTOR $2,467 $2,100 Not Implemented
OR0390 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,749 $1,700 Implemented
OR0390 # 04 Y:2001 04 2001 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,277 $2,100 Implemented
OR0390 # 05 Y:2001 05 2001 COMBINE UTILITY METERS $1,062 $3,925 Not Implemented
OR0389 # 01 Y:2001 01 2001 MODIFY CURRENT INCENTIVE PROGRAM $289,800 $26,680 Implemented
OR0389 # 02 Y:2001 02 2001 CHANGE METHOD OF DEIONIZED WATER PRODUCTION $29,980 $20,000 Implemented