IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,394

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0697 # 10 Y:2004 10 2004 REDUCE VENTILATION AIR $804 $0 Not Implemented
UD0697 # 11 Y:2004 11 2004 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $782 $0 Implemented
UD0697 # 12 Y:2004 12 2004 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $244 $0 Implemented
UD0697 # 13 Y:2004 13 2004 INSULATE BARE EQUIPMENT $240 $91 Implemented
UD0697 # 14 Y:2004 14 2004 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $49 $0 Not Implemented
OK0689 # 01 Y:2004 01 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,021 $1,180 Not Implemented
OK0689 # 02 Y:2004 02 2004 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $857 $0 Not Implemented
OK0689 # 03 Y:2004 03 2004 INSTALL OCCUPANCY SENSORS $1,079 $2,156 Implemented
OK0689 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,433 $252 Implemented
OK0689 # 05 Y:2004 05 2004 INSTALL SET-BACK TIMERS $853 $822 Not Implemented
OK0689 # 06 Y:2004 06 2004 RECOVER WASTE HEAT FROM EQUIPMENT $1,521 $472 Not Implemented
OK0689 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,393 $758 Not Implemented
SU0189 # 01 Y:2004 01 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,275 $0 Not Implemented
SU0189 # 02 Y:2004 02 2004 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,940 $0 Implemented
SU0189 # 03 Y:2004 03 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,291 $378 Implemented
SU0189 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,591 $1,175 Implemented
SU0189 # 05 Y:2004 05 2004 BURN A LESS EXPENSIVE GRADE OF FUEL $49,312 $60,000 Implemented
SU0189 # 06 Y:2004 06 2004 RECOVER WASTE HEAT FROM EQUIPMENT $36,510 $45,708 Not Implemented
SF0285 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,525 $0 Implemented
SF0285 # 02 Y:2004 02 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,594 $0 Not Implemented
SF0285 # 03 Y:2004 03 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $808 $0 Implemented
SF0285 # 04 Y:2004 04 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $674 $0 Implemented
SF0285 # 05 Y:2004 05 2004 INSTALL OCCUPANCY SENSORS $858 $2,022 Not Implemented
SF0285 # 06 Y:2004 06 2004 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $218 $586 Not Implemented
SF0285 # 07 Y:2004 07 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $579 $2,142 Not Implemented