Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,002
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0219 # 03 Y:2012 | 03 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,535 | $1,800 | Implemented |
MI0219 # 04 Y:2012 | 04 | 2012 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,117 | $4,992 | Not Implemented |
MI0219 # 05 Y:2012 | 05 | 2012 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,739 | $6,080 | Implemented |
MI0219 # 06 Y:2012 | 06 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,042 | $80 | Not Implemented |
MI0219 # 07 Y:2012 | 07 | 2012 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $895 | $2,320 | Implemented |
MI0219 # 08 Y:2012 | 08 | 2012 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $734 | $120 | Implemented |
UA0077 # 01 Y:2012 | 01 | 2012 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $17,475 | $1,000 | Not Implemented |
UA0077 # 02 Y:2012 | 02 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $17,282 | $20,463 | Not Implemented |
UA0077 # 03 Y:2012 | 03 | 2012 | COVER OPEN TANKS | $4,562 | $154 | Not Implemented |
UA0077 # 04 Y:2012 | 04 | 2012 | USE OPTIMUM THICKNESS INSULATION | $880 | $913 | Not Implemented |
UA0077 # 05 Y:2012 | 05 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $24,553 | $800 | Not Implemented |
UA0077 # 06 Y:2012 | 06 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,608 | $2,000 | Not Implemented |
UA0077 # 07 Y:2012 | 07 | 2012 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,398 | $58 | Not Implemented |
MAS020 # 01 Y:2012 | 01 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $32,764 | $7,000 | Implemented |
MAS020 # 02 Y:2012 | 02 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $29,617 | $60,000 | Not Implemented |
MAS020 # 03 Y:2012 | 03 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,203 | $7,700 | Not Implemented |
MAS020 # 04 Y:2012 | 04 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,667 | $11,600 | Implemented |
MAS020 # 05 Y:2012 | 05 | 2012 | REDUCE EXCESS STEAM BLEEDING | $1,611 | $500 | Implemented |
MI0218 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $78,730 | $63,811 | Not Implemented |
MI0218 # 02 Y:2012 | 02 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $71,478 | $47,240 | Not Implemented |
MI0218 # 03 Y:2012 | 03 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $53,118 | $2,520 | Implemented |
MI0218 # 04 Y:2012 | 04 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $25,712 | $21,000 | Not Implemented |
MI0218 # 05 Y:2012 | 05 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $21,901 | $1,660 | Implemented |
MI0218 # 06 Y:2012 | 06 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $19,917 | $6,660 | Not Implemented |
MI0218 # 07 Y:2012 | 07 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,529 | $8,200 | Not Implemented |