IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

158,455

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0651 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,830 $2,314 Implemented
WV0651 # 04 Y:2023 04 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $930 $2,863 Not Implemented
WV0651 # 05 Y:2023 05 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $928 $823 Not Implemented
WV0651 # 06 Y:2023 06 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $846 $228 Implemented
WV0651 # 07 Y:2023 07 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $854 $4,011 Not Implemented
WV0651 # 08 Y:2023 08 2023 INSTALL SET-BACK TIMERS $608 $1,271 Not Implemented
WV0651 # 09 Y:2023 09 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $430 $217 Implemented
WV0651 # 10 Y:2023 10 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $360 $1,750 Not Implemented
WV0651 # 11 Y:2023 11 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $140 $656 Implemented
MZ0350 # 01 Y:2023 01 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,815 $440 n/a
MZ0350 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,082 $600 n/a
MZ0350 # 03 Y:2023 03 2023 USE DEMAND CONTROLLER OR LOAD SHEDDER $8,826 $2,520 n/a
MZ0350 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $9,435 $9,200 n/a
MZ0350 # 05 Y:2023 05 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $60,709 $140,732 n/a
NL0083 # 01 Y:2023 01 2023 METER WASTE WATER $31,255 $85,280 n/a
NL0083 # 02 Y:2023 02 2023 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $18,134 $16,860 n/a
NL0083 # 03 Y:2023 03 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $11,038 $4,600 n/a
NL0083 # 04 Y:2023 04 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,182 $4,945 n/a
NL0083 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $854 $470 n/a
NL0083 # 06 Y:2023 06 2023 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $800 $1,548 n/a
NL0083 # 07 Y:2023 07 2023 IMPLEMENT A MAINTENANCE PROGRAM TO KEEP RACKS AND TANKS FREE OF RUST, CRACKS, OR CORROSION $200 $40 n/a
UU0228 # 01 Y:2023 01 2023 OPERATE BOILERS ON HIGH FIRE SETTING $5,182 $15,000 n/a
UU0228 # 02 Y:2023 02 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $3,009 $850 n/a
UU0228 # 03 Y:2023 03 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $2,221 $85 n/a
UU0228 # 04 Y:2023 04 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $1,330 $2,040 n/a