IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,644

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0353 # 07 Y:2007 07 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,148 $19,000 Implemented
WV0353 # 08 Y:2007 08 2007 RECOVER WASTE HEAT FROM EQUIPMENT $5,712 $400 Not Implemented
WV0353 # 09 Y:2007 09 2007 OPTIMIZE PLANT POWER FACTOR $4,799 $17,500 Not Implemented
WV0353 # 10 Y:2007 10 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,101 $3,500 Implemented
WV0353 # 11 Y:2007 11 2007 DEVELOP A REPAIR/REPLACE POLICY $1,883 $400 Implemented
WV0353 # 12 Y:2007 12 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,356 $200 Not Implemented
WV0353 # 13 Y:2007 13 2007 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $887 $200 Implemented
WV0353 # 14 Y:2007 14 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $796 $3,000 Implemented
SU0246 # 01 Y:2007 01 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,554 $0 Implemented
SU0246 # 02 Y:2007 02 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,404 $0 Implemented
SU0246 # 03 Y:2007 03 2007 USE SYNTHETIC LUBRICANT $2,489 $0 Implemented
SU0246 # 04 Y:2007 04 2007 MAKE A NEW BY-PRODUCT $402,220 $41,000 Not Implemented
SU0246 # 05 Y:2007 05 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,989 $42 Implemented
SU0246 # 06 Y:2007 06 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,230 $850 Implemented
SU0246 # 07 Y:2007 07 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,697 $10,420 Implemented
LE0246 # 01 Y:2006 01 2006 USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS $66,327 $5,000 Implemented
LE0246 # 02 Y:2006 02 2006 REUSE RICH WHITE WATER IN OTHER APPLICATIONS $14,590 $20,000 Not Implemented
LE0246 # 03 Y:2006 03 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,683 $6,700 Implemented
LE0246 # 04 Y:2006 04 2006 MINIMIZE WATER USAGE $6,264 $1,800 Not Implemented
LE0246 # 05 Y:2006 05 2006 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $6,033 $5,000 Implemented
LE0246 # 06 Y:2006 06 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,372 $2,500 Not Implemented
LE0246 # 07 Y:2006 07 2006 USE UTILITY CONTROLLED POWER MANAGEMENT $3,000 $100 Not Implemented
LE0246 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,948 $180,000 Implemented
LE0246 # 09 Y:2006 09 2006 INSTALL OCCUPANCY SENSORS $1,586 $450 Implemented
LE0247 # 01 Y:2006 01 2006 REPLACE BOILER $115,080 $223,000 Not Implemented