IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,289

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OD0137 # 06 Y:1999 06 1999 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $402 $1,870 Not Implemented
NC0164 # 01 Y:1999 01 1999 ADJUST BURNERS FOR EFFICIENT OPERATION $8,380 $700 Implemented
NC0164 # 02 Y:1999 02 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $18 $1,345 Not Implemented
NC0164 # 03 Y:1999 03 1999 INSTALL SKYLIGHTS $4,672 $35,090 Implemented
NC0164 # 04 Y:1999 04 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,553 $9,000 Implemented
NC0164 # 05 Y:1999 05 1999 MINIMIZE WATER USAGE $1,767 $0 Implemented
NC0164 # 06 Y:1999 06 1999 BURN WASTE OIL FOR HEAT $40,650 $30,000 Implemented
NC0164 # 07 Y:1999 07 1999 ADOPT IN-HOUSE MATERIAL GENERATION $1,975 $2,500 Implemented
NC0161 # 01 Y:1999 01 1999 RECOVER WASTE HEAT FROM EQUIPMENT $1,160 $500 Not Implemented
NC0161 # 02 Y:1999 02 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,328 $20 Not Implemented
NC0161 # 03 Y:1999 03 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,140 $1,650 Implemented
NC0161 # 04 Y:1999 04 1999 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $160,533 $279,000 Not Implemented
NC0161 # 05 Y:1999 05 1999 BURN WASTE PAPER FOR HEAT $281 $0 Not Implemented
NC0163 # 01 Y:1999 01 1999 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $11,222 $17,000 Implemented
NC0163 # 02 Y:1999 02 1999 RECOVER WASTE HEAT FROM EQUIPMENT $1,614 $1,600 Implemented
NC0163 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,866 $25 Implemented
NC0163 # 04 Y:1999 04 1999 COVER OPEN TANKS $24,515 $21,000 Not Implemented
NC0163 # 05 Y:1999 05 1999 RECOVER WASTE HEAT FROM EQUIPMENT $19,985 $35,000 Not Implemented
NC0163 # 06 Y:1999 06 1999 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $4,068 $1,000 Implemented
NC0163 # 07 Y:1999 07 1999 TREAT AND REUSE RINSE WATERS $7,389 $4,500 Implemented
NC0163 # 08 Y:1999 08 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $55,000 $14,000 Implemented
TN0659 # 01 Y:1999 01 1999 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $135,000 $32,200 Implemented
TN0659 # 02 Y:1999 02 1999 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $15,965 $4,260 Not Implemented
TN0659 # 03 Y:1999 03 1999 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $6,520 $10,300 Not Implemented
TN0659 # 04 Y:1999 04 1999 PURCHASE APPROPRIATELY SIZED MATERIAL $5,860 $0 Not Implemented