IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,875

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0204 # 04 Y:2005 04 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $175 $0 Implemented
SU0204 # 05 Y:2005 05 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,158 $344 Not Implemented
SU0204 # 06 Y:2005 06 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,236 $748 Not Implemented
SU0204 # 07 Y:2005 07 2005 USE SYNTHETIC LUBRICANT $3,145 $2,000 Implemented
SU0204 # 08 Y:2005 08 2005 OPTIMIZE PLANT POWER FACTOR $3,731 $11,931 Not Implemented
SU0203 # 01 Y:2005 01 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,139 $0 Not Implemented
SU0203 # 02 Y:2005 02 2005 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $9,582 $0 Not Implemented
SU0203 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,367 $366 Implemented
SU0203 # 04 Y:2005 04 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,129 $308 Implemented
SU0203 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,105 $960 Implemented
SU0203 # 06 Y:2005 06 2005 INSTALL OCCUPANCY SENSORS $1,344 $1,090 Not Implemented
SU0203 # 07 Y:2005 07 2005 INSTALL SOLID WASTE INCINERATOR FOR HEAT $16,477 $25,850 Not Implemented
SU0201 # 01 Y:2005 01 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,721 $0 Implemented
SU0201 # 02 Y:2005 02 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,094 $142 Not Implemented
SU0201 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,555 $617 Implemented
SU0201 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $673 $461 Implemented
SU0201 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,182 $3,211 Implemented
SU0201 # 06 Y:2005 06 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,591 $20,054 Not Implemented
SU0200 # 01 Y:2005 01 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $470 $0 Not Implemented
SU0200 # 02 Y:2005 02 2005 RECOVER WASTE HEAT FROM EQUIPMENT $5,068 $375 Implemented
SU0200 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,047 $169 Implemented
SU0200 # 04 Y:2005 04 2005 RECOVER WASTE HEAT FROM EQUIPMENT $9,439 $1,636 Implemented
SU0200 # 05 Y:2005 05 2005 INSTALL OCCUPANCY SENSORS $327 $374 Implemented
SU0199 # 01 Y:2005 01 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $144 $0 Implemented
SU0199 # 02 Y:2005 02 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,830 $0 Not Implemented