IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,403

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0590 # 09 Y:1996 09 1996 INCREASE AMOUNT OF CONDENSATE RETURNED $34,612 $31,200 Implemented
MO0178 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $535 $394 Implemented
MO0178 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $892 $1,216 Not Implemented
MO0178 # 03 Y:1996 03 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,595 $120 Implemented
MO0178 # 04 Y:1996 04 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,347 $1,281 Not Implemented
MO0178 # 05 Y:1996 05 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,106 $80 Not Implemented
OD0057 # 01 Y:1996 01 1996 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,833 $500 Implemented
OD0057 # 02 Y:1996 02 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,120 $600 Implemented
OD0057 # 03 Y:1996 03 1996 RECOVER WASTE HEAT FROM EQUIPMENT $1,630 $1,950 Implemented
OD0057 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,768 $430 Implemented
OD0057 # 05 Y:1996 05 1996 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,639 $4,232 Not Implemented
OD0057 # 06 Y:1996 06 1996 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $751 $200 Not Implemented
MO0178 # 06 Y:1996 06 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $268 $0 Implemented
MO0178 # 07 Y:1996 07 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,458 $3,003 Not Implemented
MO0178 # 08 Y:1996 08 1996 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $4,000 $8,000 Not Implemented
AS0180 # 01 Y:1996 01 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,604 $0 Not Implemented
AS0180 # 02 Y:1996 02 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $18,978 $14,977 Implemented
AS0180 # 03 Y:1996 03 1996 INSTALL OCCUPANCY SENSORS $2,295 $1,350 Not Implemented
AS0180 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,307 $9,177 Not Implemented
AS0180 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,240 $5,343 Not Implemented
AS0180 # 06 Y:1996 06 1996 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $63,244 $50,000 Implemented
AS0180 # 07 Y:1996 07 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,003 $0 Not Implemented
AS0180 # 08 Y:1996 08 1996 INSTALL TIMERS AND/OR THERMOSTATS $391 $320 Not Implemented
AS0180 # 09 Y:1996 09 1996 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $1,648 $30 Implemented
AS0180 # 10 Y:1996 10 1996 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $330 $30 Implemented