Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,872
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0320 # 05 Y:1998 | 05 | 1998 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $857 | $0 | Not Implemented |
OR0320 # 06 Y:1998 | 06 | 1998 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $27,785 | $0 | Implemented |
OR0320 # 07 Y:1998 | 07 | 1998 | $94,439 | $150,000 | Not Implemented | |
OR0320 # 08 Y:1998 | 08 | 1998 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $5,087 | $6,000 | Not Implemented |
OR0320 # 09 Y:1998 | 09 | 1998 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $1,387 | $0 | Not Implemented |
OR0320 # 10 Y:1998 | 10 | 1998 | INSULATE BARE EQUIPMENT | $6,161 | $217 | Not Implemented |
MA0412 # 01 Y:1998 | 01 | 1998 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $25,681 | $7,454 | Implemented |
MA0412 # 02 Y:1998 | 02 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,189 | $9,625 | Not Implemented |
MA0412 # 03 Y:1998 | 03 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,088 | $323 | Implemented |
MA0412 # 04 Y:1998 | 04 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,686 | $3,400 | Implemented |
MA0412 # 05 Y:1998 | 05 | 1998 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $925 | $403 | Implemented |
MA0412 # 06 Y:1998 | 06 | 1998 | $65,920 | $385,000 | Not Implemented | |
MA0412 # 07 Y:1998 | 07 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,050 | $7,800 | Not Implemented |
KU0495 # 03 Y:1998 | 03 | 1998 | USE SYNTHETIC LUBRICANT | $3,080 | $2,650 | Implemented |
KU0495 # 04 Y:1998 | 04 | 1998 | OPTIMIZE PLANT POWER FACTOR | $2,850 | $13,260 | Not Implemented |
KU0495 # 05 Y:1998 | 05 | 1998 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,380 | $1,490 | Implemented |
KU0495 # 06 Y:1998 | 06 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,550 | $490 | Implemented |
KU0495 # 07 Y:1998 | 07 | 1998 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $880 | $1,000 | Not Implemented |
KU0495 # 08 Y:1998 | 08 | 1998 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $6,770 | $7,000 | Not Implemented |
KU0495 # 09 Y:1998 | 09 | 1998 | METER WASTE WATER | $850 | $100 | Implemented |
KU0495 # 10 Y:1998 | 10 | 1998 | $25,200 | $33,030 | Not Implemented | |
KU0495 # 11 Y:1998 | 11 | 1998 | $22,420 | $24,760 | Not Implemented | |
BD0111 # 01 Y:1998 | 01 | 1998 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $14,714 | $2,000 | n/a |
BD0111 # 02 Y:1998 | 02 | 1998 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $5,826 | $6,050 | n/a |
BD0111 # 03 Y:1998 | 03 | 1998 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,891 | $325 | n/a |