Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,568
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0072 # 03 Y:1989 | 03 | 1989 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $40 | $49 | Implemented |
OR0072 # 04 Y:1989 | 04 | 1989 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $2,002 | $3,264 | Not Implemented |
OR0072 # 05 Y:1989 | 05 | 1989 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $4,874 | $7,000 | Implemented |
OR0073 # 01 Y:1989 | 01 | 1989 | RECOVER AND REUSE COOLING WATER | $2,582 | $434 | Implemented |
OR0073 # 02 Y:1989 | 02 | 1989 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $797 | $150 | Not Implemented |
OR0073 # 03 Y:1989 | 03 | 1989 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $3,597 | $0 | Implemented |
OR0073 # 04 Y:1989 | 04 | 1989 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $872 | $883 | Implemented |
OR0073 # 05 Y:1989 | 05 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,024 | $2,931 | Implemented |
OR0073 # 06 Y:1989 | 06 | 1989 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $770 | $1,000 | Implemented |
OR0073 # 07 Y:1989 | 07 | 1989 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $1,207 | $2,980 | Not Implemented |
OR0069 # 01 Y:1989 | 01 | 1989 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,137 | $0 | Implemented |
OR0069 # 02 Y:1989 | 02 | 1989 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $9,222 | $500 | Implemented |
OR0069 # 03 Y:1989 | 03 | 1989 | INSTALL SET-BACK TIMERS | $725 | $100 | Implemented |
OR0069 # 04 Y:1989 | 04 | 1989 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $59 | $45 | Implemented |
OR0069 # 05 Y:1989 | 05 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,854 | $3,938 | Implemented |
OR0069 # 06 Y:1989 | 06 | 1989 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $952 | $300 | Implemented |
OR0069 # 07 Y:1989 | 07 | 1989 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $108 | $200 | Implemented |
OR0069 # 08 Y:1989 | 08 | 1989 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $20,105 | $55,093 | Implemented |
OR0065 # 01 Y:1989 | 01 | 1989 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,924 | $2,050 | Implemented |
OR0065 # 02 Y:1989 | 02 | 1989 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,603 | $1,075 | Not Implemented |
OR0065 # 03 Y:1989 | 03 | 1989 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $338 | $150 | Implemented |
OR0065 # 04 Y:1989 | 04 | 1989 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $394 | $279 | Implemented |
OR0065 # 05 Y:1989 | 05 | 1989 | OPTIMIZE PLANT POWER FACTOR | $5,181 | $5,400 | Not Implemented |
OR0065 # 06 Y:1989 | 06 | 1989 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,845 | $2,000 | Implemented |
OR0066 # 01 Y:1989 | 01 | 1989 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $2,525 | $110 | Implemented |