IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,644

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0245 # 01 Y:2006 01 2006 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $318,192 $1,250 Not Implemented
LE0245 # 02 Y:2006 02 2006 REPAIR OR REPLACE STEAM TRAPS $47,703 $5,000 Not Implemented
LE0245 # 03 Y:2006 03 2006 REUSE RICH WHITE WATER IN OTHER APPLICATIONS $43,680 $5,000 Not Implemented
LE0245 # 04 Y:2006 04 2006 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $41,698 $30,000 Not Implemented
LE0245 # 05 Y:2006 05 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,138 $2,500 Implemented
LE0245 # 06 Y:2006 06 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,828 $8,700 Implemented
LE0245 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,030 $2,000 Not Implemented
LE0245 # 08 Y:2006 08 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,646 $2,500 Not Implemented
LE0245 # 09 Y:2006 09 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,796 $3,000 Implemented
LE0245 # 10 Y:2006 10 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,488 $1,000 Not Implemented
SU0242 # 01 Y:2006 01 2006 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $139,633 $0 Not Implemented
SU0242 # 02 Y:2006 02 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,294 $0 Not Implemented
SU0242 # 03 Y:2006 03 2006 USE SYNTHETIC LUBRICANT $7,884 $0 Not Implemented
SU0242 # 04 Y:2006 04 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,673 $0 Implemented
SU0242 # 05 Y:2006 05 2006 INSULATE BARE EQUIPMENT $12,811 $4,204 Implemented
SU0242 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,265 $524 Implemented
SU0242 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,530 $32,632 Implemented
SU0242 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $849 $1,005 Implemented
SU0242 # 09 Y:2006 09 2006 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $126 $632 Implemented
SU0242 # 10 Y:2006 10 2006 INSTALL OCCUPANCY SENSORS $67 $432 Not Implemented
WV0347 # 01 Y:2006 01 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $255,013 $57,159 Implemented
WV0347 # 02 Y:2006 02 2006 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $32,512 $24,300 Not Implemented
WV0347 # 03 Y:2006 03 2006 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $11,796 $1,000 Implemented
WV0347 # 04 Y:2006 04 2006 DEVELOP A REPAIR/REPLACE POLICY $10,908 $504 Implemented
WV0347 # 05 Y:2006 05 2006 UTILIZE A LESS EXPENSIVE COOLING METHOD $10,012 $13,815 Not Implemented