IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,520

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0664 # 05 Y:1999 05 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,487 $890 Not Implemented
GT0664 # 06 Y:1999 06 1999 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,985 $660 Implemented
GT0664 # 07 Y:1999 07 1999 INSTALL FOSSIL FUEL MAKE-UP AIR UNIT $2,110 $5,500 Not Implemented
GT0664 # 08 Y:1999 08 1999 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $29,350 $5,500 Not Implemented
GT0664 # 09 Y:1999 09 1999 MINIMIZE WATER USAGE $3,000 $10,100 Not Implemented
MA0441 # 01 Y:1999 01 1999 $21,168 $5,704 Implemented
MA0441 # 02 Y:1999 02 1999 $43,200 $3,000 Implemented
MA0441 # 03 Y:1999 03 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $15,964 $40,000 Not Implemented
MA0441 # 04 Y:1999 04 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,069 $26,625 Not Implemented
MA0441 # 05 Y:1999 05 1999 UPGRADE OBSOLETE EQUIPMENT $789 $0 Implemented
MA0441 # 06 Y:1999 06 1999 INSULATE BARE EQUIPMENT $632 $2,250 Implemented
TN0661 # 01 Y:1999 01 1999 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $175,335 $5,000 Implemented
TN0661 # 02 Y:1999 02 1999 $91,400 $49,760 Not Implemented
TN0661 # 03 Y:1999 03 1999 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $73,031 $8,750 Not Implemented
TN0661 # 04 Y:1999 04 1999 OPTIMIZE PLANT POWER FACTOR $72,160 $93,000 Not Implemented
TN0661 # 05 Y:1999 05 1999 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $39,290 $2,720 Not Implemented
TN0661 # 06 Y:1999 06 1999 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $25,103 $30,600 Implemented
TN0661 # 07 Y:1999 07 1999 METER WASTE WATER $13,500 $3,700 Not Implemented
TN0661 # 08 Y:1999 08 1999 INSTALL TIMERS AND/OR THERMOSTATS $6,500 $650 Not Implemented
MS0134 # 01 Y:1999 01 1999 INSTALL TIMERS AND/OR THERMOSTATS $441 $119 Not Implemented
MS0134 # 02 Y:1999 02 1999 OPTIMIZE PLANT POWER FACTOR $10,451 $11,700 Not Implemented
MS0134 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,511 $1,129 Implemented
MS0134 # 04 Y:1999 04 1999 USE PHOTOCELL CONTROLS $287 $217 Not Implemented
MS0134 # 05 Y:1999 05 1999 USE SYNTHETIC LUBRICANT $933 $275 Implemented
MS0134 # 06 Y:1999 06 1999 $356,922 $862,280 Not Implemented