Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,708
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0210 # 01 Y:2002 | 01 | 2002 | USE RADIANT HEATER FOR SPOT HEATING | $4,813 | $9,000 | Implemented |
BD0210 # 02 Y:2002 | 02 | 2002 | ADD AREA LIGHTING SWITCHES | $3,792 | $2,700 | Implemented |
BD0210 # 03 Y:2002 | 03 | 2002 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $3,594 | $3,500 | Implemented |
BD0210 # 04 Y:2002 | 04 | 2002 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $703 | $2,500 | Not Implemented |
BD0210 # 05 Y:2002 | 05 | 2002 | INSTALL OCCUPANCY SENSORS | $516 | $750 | Implemented |
BD0210 # 06 Y:2002 | 06 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $439 | $1,200 | Implemented |
BD0210 # 07 Y:2002 | 07 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $422 | $500 | Implemented |
BD0210 # 08 Y:2002 | 08 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $-124 | $281 | Implemented |
BD0210 # 09 Y:2002 | 09 | 2002 | USE EVAPORATION TO CONCENTRATE MATERIAL | $406 | $1,200 | Implemented |
BD0210 # 10 Y:2002 | 10 | 2002 | MODIFY STARTUP/SHUTDOWN TIMES | $26,800 | $5,000 | Not Implemented |
CO0502 # 01 Y:2002 | 01 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,320 | $53,800 | Not Implemented |
CO0502 # 02 Y:2002 | 02 | 2002 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,090 | $6,200 | Not Implemented |
CO0502 # 03 Y:2002 | 03 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,060 | $1,050 | Implemented |
CO0502 # 04 Y:2002 | 04 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $830 | $0 | Not Implemented |
CO0502 # 05 Y:2002 | 05 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $360 | $30 | Implemented |
MI0035 # 01 Y:2002 | 01 | 2002 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $10,558 | $975 | Not Implemented |
MI0035 # 02 Y:2002 | 02 | 2002 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $29,975 | $12,885 | Implemented |
MI0035 # 03 Y:2002 | 03 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,768 | $240 | Implemented |
MI0035 # 04 Y:2002 | 04 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,825 | $2,000 | Not Implemented |
MI0035 # 05 Y:2002 | 05 | 2002 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,597 | $3,500 | Not Implemented |
MI0035 # 06 Y:2002 | 06 | 2002 | INSTALL / REPAIR INSULATION ON STEAM LINES | $819 | $240 | Not Implemented |
LL0135 # 02 Y:2002 | 02 | 2002 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $225,040 | $57,600 | Not Implemented |
LL0135 # 03 Y:2002 | 03 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $36,016 | $13,170 | Implemented |
LL0135 # 04 Y:2002 | 04 | 2002 | OPTIMIZE PLANT POWER FACTOR | $35,735 | $32,655 | Not Implemented |
LL0135 # 05 Y:2002 | 05 | 2002 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $11,865 | $3,600 | Implemented |