Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,533
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0362 # 02 Y:2005 | 02 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,270 | $1,000 | Implemented |
IA0362 # 03 Y:2005 | 03 | 2005 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $845 | $207 | Not Implemented |
IA0362 # 04 Y:2005 | 04 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,552 | $3,000 | Implemented |
IA0362 # 05 Y:2005 | 05 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $429 | $502 | Implemented |
IA0362 # 06 Y:2005 | 06 | 2005 | INSTALL OCCUPANCY SENSORS | $511 | $1,309 | Not Implemented |
IA0362 # 07 Y:2005 | 07 | 2005 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $791 | $350 | Not Implemented |
IA0362 # 08 Y:2005 | 08 | 2005 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $6,630 | $0 | Not Implemented |
IA0362 # 09 Y:2005 | 09 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $352 | $471 | Implemented |
IA0362 # 10 Y:2005 | 10 | 2005 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $6,630 | $2,280 | Not Implemented |
IA0362 # 11 Y:2005 | 11 | 2005 | PAY BILLS ON TIME TO AVOID LATE FEES | $1,000 | $0 | Not Implemented |
MA0575 # 01 Y:2005 | 01 | 2005 | INSULATE BARE EQUIPMENT | $68,834 | $23,508 | Implemented |
MA0575 # 02 Y:2005 | 02 | 2005 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $26,800 | $41,620 | Implemented |
MA0575 # 03 Y:2005 | 03 | 2005 | REPAIR AND ELIMINATE STEAM LEAKS | $18,805 | $517 | Implemented |
MA0575 # 04 Y:2005 | 04 | 2005 | INSULATE BARE EQUIPMENT | $1,944 | $7,285 | Implemented |
MA0575 # 05 Y:2005 | 05 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,023 | $0 | Not Implemented |
MA0575 # 06 Y:2005 | 06 | 2005 | OPTIMIZE PLANT POWER FACTOR | $512 | $195 | Not Implemented |
MA0575 # 07 Y:2005 | 07 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $233 | $30 | Not Implemented |
WI0491 # 01 Y:2005 | 01 | 2005 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $23,636 | $25,000 | Not Implemented |
WI0491 # 02 Y:2005 | 02 | 2005 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $12,939 | $15,000 | Not Implemented |
WI0491 # 03 Y:2005 | 03 | 2005 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $7,911 | $5,000 | Implemented |
WI0491 # 04 Y:2005 | 04 | 2005 | IMPROVE LUBRICATION PRACTICES | $1,322 | $2,340 | Not Implemented |
WI0491 # 05 Y:2005 | 05 | 2005 | INSTALL OCCUPANCY SENSORS | $1,112 | $1,680 | Implemented |
WI0491 # 06 Y:2005 | 06 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $706 | $1,244 | Implemented |
SD0362 # 01 Y:2005 | 01 | 2005 | DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING | $41,074 | $6,300 | Implemented |
SD0362 # 02 Y:2005 | 02 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $16,917 | $0 | Implemented |