IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,907

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0304 # 07 Y:2024 07 2024 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $5,023 $0 Not Implemented
IC0304 # 08 Y:2024 08 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $13,654 $250 Not Implemented
IC0304 # 09 Y:2024 09 2024 INSULATE BARE EQUIPMENT $32,173 $3,405 Not Implemented
IP0192 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,354 $35 Not Implemented
IP0192 # 02 Y:2024 02 2024 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $546 $0 Not Implemented
IP0192 # 03 Y:2024 03 2024 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,767 $448 Not Implemented
IP0192 # 04 Y:2024 04 2024 RECOVER WASTE HEAT FROM EQUIPMENT $3,831 $1,865 Not Implemented
IP0192 # 05 Y:2024 05 2024 INSTALL OCCUPANCY SENSORS $1,967 $1,205 Not Implemented
IP0192 # 06 Y:2024 06 2024 USE IMMERSION HEATING IN TANKS, MELTING POTS, ETC $1,077 $1,105 Not Implemented
IP0192 # 07 Y:2024 07 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,546 $2,248 Not Implemented
UU0248 # 01 Y:2024 01 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $980 $2,600 Implemented
UU0248 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,740 $1,270 Implemented
UU0248 # 03 Y:2024 03 2024 USE AUTOMATIC FLOW CONTROL $820 $4,250 Not Implemented
UU0248 # 04 Y:2024 04 2024 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $33,420 $319,250 Implemented
UU0248 # 05 Y:2024 05 2024 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $6,380 $133,800 Not Implemented
UU0248 # 06 Y:2024 06 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $940 $3,000 Implemented
UU0248 # 07 Y:2024 07 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,570 $9,360 Not Implemented
UU0247 # 01 Y:2024 01 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $5,970 $3,000 Implemented
UU0247 # 02 Y:2024 02 2024 RECOVER WASTE HEAT FROM EQUIPMENT $1,770 $9,500 Not Implemented
UU0247 # 03 Y:2024 03 2024 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $200,000 $717,040 Not Implemented
UU0247 # 04 Y:2024 04 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $1,060 $1,950 Implemented
UU0247 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $864 $7,540 Implemented
WV0661 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,612 $15,969 Not Implemented
WV0661 # 02 Y:2024 02 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,983 $9,744 Not Implemented
WV0661 # 03 Y:2024 03 2024 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,731 $9,700 Not Implemented