IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,289

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0158 # 07 Y:1999 07 1999 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $5,794 $2,500 Implemented
NC0158 # 08 Y:1999 08 1999 REDUCE SCRAP PRODUCTION $2,360 $4,100 Implemented
NC0158 # 09 Y:1999 09 1999 CLEAR AND RENT EXISTING SPACE $26,000 $640 Implemented
NC0158 # 10 Y:1999 10 1999 MOVE PRODUCT USING MECHANICAL MEANS $3,600 $500 Implemented
NC0158 # 11 Y:1999 11 1999 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $680 $1,000 Implemented
NC0158 # 12 Y:1999 12 1999 IMPROVE SPACE COMFORT CONDITIONING $81,800 $13,500 Not Implemented
NC0160 # 01 Y:1999 01 1999 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,733 $1,400 Implemented
NC0160 # 02 Y:1999 02 1999 RECOVER WASTE HEAT FROM EQUIPMENT $2,043 $2,000 Implemented
NC0160 # 03 Y:1999 03 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $30,992 $6,000 Not Implemented
NC0160 # 04 Y:1999 04 1999 INSTALL SKYLIGHTS $1,207 $2,000 Implemented
NC0160 # 05 Y:1999 05 1999 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $21,795 $20,000 Not Implemented
NC0160 # 06 Y:1999 06 1999 ELIMINATE LEAKS IN WATER LINES AND VALVES $1,045 $1,550 Implemented
NC0160 # 07 Y:1999 07 1999 ADOPT IN-HOUSE MATERIAL GENERATION $49,559 $100,000 Implemented
TN0653 # 01 Y:1999 01 1999 USE A DIFFERENT OR RECYCLED RAW MATERIAL $218,445 $60,080 Not Implemented
TN0653 # 02 Y:1999 02 1999 ADD ADDITIONAL PRODUCTION SHIFT $192,000 $61,600 Implemented
TN0653 # 03 Y:1999 03 1999 INSTALL EQUIPMENT TO MOVE PRODUCT $22,520 $33,250 Not Implemented
TN0653 # 04 Y:1999 04 1999 USE MORE EFFICIENT ADHESIVE APPLICATORS $14,650 $18,420 Implemented
TN0653 # 05 Y:1999 05 1999 BURN A LESS EXPENSIVE GRADE OF FUEL $11,640 $25,825 Implemented
TN0653 # 06 Y:1999 06 1999 USE RADIANT HEATER FOR SPOT HEATING $5,590 $17,025 Implemented
TN0653 # 07 Y:1999 07 1999 INSULATE BARE EQUIPMENT $3,900 $2,545 Implemented
NC0157 # 01 Y:1999 01 1999 RECOVER WASTE HEAT FROM EQUIPMENT $1,968 $1,500 Not Implemented
NC0157 # 02 Y:1999 02 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,307 $240 Not Implemented
NC0157 # 03 Y:1999 03 1999 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $6,654 $2,000 Not Implemented
NC0157 # 04 Y:1999 04 1999 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $98,761 $465,000 Not Implemented
NC0157 # 05 Y:1999 05 1999 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $17,776 $20,000 Not Implemented