IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,996

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DS0095 # 02 Y:1997 02 1997 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $179 $53 Implemented
DS0095 # 03 Y:1997 03 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $472 $750 Not Implemented
DS0095 # 04 Y:1997 04 1997 OPTIMIZE PLANT POWER FACTOR $1,824 $2,094 Implemented
DS0095 # 05 Y:1997 05 1997 USE LESS WASTEFUL PACKAGING $11,890 $4,000 Implemented
DS0095 # 06 Y:1997 06 1997 INSULATE BARE EQUIPMENT $13,509 $62,000 Implemented
DS0095 # 07 Y:1997 07 1997 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $3,982 $2,500 Not Implemented
UF0179 # 01 Y:1997 01 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,524 $352 Not Implemented
UF0179 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,163 $34,581 Not Implemented
UF0179 # 03 Y:1997 03 1997 INSTALL OCCUPANCY SENSORS $570 $820 Not Implemented
UF0179 # 04 Y:1997 04 1997 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $2,876 $3,700 Not Implemented
UF0179 # 05 Y:1997 05 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,421 $8,860 Not Implemented
UF0179 # 06 Y:1997 06 1997 USE A DIFFERENT OR RECYCLED RAW MATERIAL $24,578 $0 Not Implemented
UF0179 # 07 Y:1997 07 1997 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $3,062 $0 Not Implemented
WI0299 # 01 Y:1997 01 1997 $36,166 $7,000 Not Implemented
WI0299 # 02 Y:1997 02 1997 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $18,337 $0 Not Implemented
WI0299 # 03 Y:1997 03 1997 DIRECT WASTE GASSES TO BOILER COMBUSTION AIR $16,400 $10,000 Implemented
WI0299 # 04 Y:1997 04 1997 PREHEAT COMBUSTION AIR WITH WASTE HEAT $15,359 $10,000 Not Implemented
WI0299 # 05 Y:1997 05 1997 $8,748 $12,000 Implemented
WI0299 # 06 Y:1997 06 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,439 $16,400 Not Implemented
WI0299 # 07 Y:1997 07 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,424 $500 Implemented
WI0299 # 08 Y:1997 08 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $784 $740 Implemented
OK0525 # 01 Y:1997 01 1997 RECYCLE CASTING SAND $290,422 $282,500 Not Implemented
OK0525 # 02 Y:1997 02 1997 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $9,080 $1,260 Not Implemented
OK0525 # 03 Y:1997 03 1997 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $5,369 $6,768 Implemented
OK0525 # 04 Y:1997 04 1997 INSTALL SET-BACK TIMERS $3,150 $630 Implemented