IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,002

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MAS021 # 01 Y:2012 01 2012 RECOVER WASTE HEAT FROM EQUIPMENT $99,334 $216,000 Not Implemented
MAS021 # 02 Y:2012 02 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $36,978 $9,000 Not Implemented
MAS021 # 03 Y:2012 03 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $18,123 $77,100 Not Implemented
MAS021 # 04 Y:2012 04 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,077 $8,000 Implemented
MAS021 # 05 Y:2012 05 2012 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $4,883 $3,120 Implemented
MAS021 # 06 Y:2012 06 2012 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $3,590 $3,120 Implemented
MAS021 # 07 Y:2012 07 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,154 $2,000 Not Implemented
NC0452 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,629 $10,000 Implemented
NC0452 # 02 Y:2012 02 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,864 $3,200 Implemented
NC0452 # 03 Y:2012 03 2012 INSTALL OCCUPANCY SENSORS $269 $375 Not Implemented
NC0452 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $270 $297 Not Implemented
NC0452 # 05 Y:2012 05 2012 USE SOLAR HEAT TO HEAT WATER $10,485 $62,000 Not Implemented
NC0453 # 01 Y:2012 01 2012 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $36,712 $21,000 Not Implemented
NC0453 # 02 Y:2012 02 2012 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $1,450 $3,000 Not Implemented
NC0453 # 03 Y:2012 03 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $598 $1,000 Not Implemented
NC0453 # 04 Y:2012 04 2012 USE DEIONIZED WATER IN UPSTREAM RINSE TANKS $4,110 $5,000 Not Implemented
NC0453 # 05 Y:2012 05 2012 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,077 $0 Not Implemented
NC0453 # 06 Y:2012 06 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,330 $600 Not Implemented
NC0453 # 07 Y:2012 07 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $650 $1,080 Not Implemented
NC0453 # 08 Y:2012 08 2012 INSTALL OCCUPANCY SENSORS $240 $352 Not Implemented
NC0453 # 09 Y:2012 09 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,228 $16,470 Not Implemented
NC0453 # 10 Y:2012 10 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,747 $16,220 Not Implemented
OK0824 # 01 Y:2012 01 2012 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $17,721 $31,152 Not Implemented
OK0824 # 02 Y:2012 02 2012 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $21,096 $22,080 Not Implemented
OK0824 # 03 Y:2012 03 2012 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $9,127 $23,400 Not Implemented