IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27,466

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0623 # 05 Y:2024 05 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $1,616 $0 Implemented
UF0623 # 06 Y:2024 06 2024 INSTALL TURBULATORS $979 $3,750 Not Implemented
UF0623 # 07 Y:2024 07 2024 IMPROVE COMBUSTION CONTROL CAPABILITY $958 $1,400 Implemented
UF0623 # 08 Y:2024 08 2024 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $56,000 $20,720 Implemented
UU0260 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $27,825 $247,680 n/a
UU0260 # 02 Y:2024 02 2024 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,585 $5,800 n/a
UU0260 # 03 Y:2024 03 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,696 $8,277 n/a
UU0260 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,557 $6,277 n/a
UU0260 # 05 Y:2024 05 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $726 $3,000 n/a
UU0260 # 06 Y:2024 06 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $489 $1,818 n/a
UD1096 # 01 Y:2024 01 2024 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,966 $0 Implemented
UD1096 # 02 Y:2024 02 2024 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $407 $114,000 Implemented
UD1096 # 03 Y:2024 03 2024 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $10,522 $1,061 Not Implemented
UD1096 # 04 Y:2024 04 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $780 $872 Not Implemented
UD1096 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,767 $6,096 Not Implemented
UD1096 # 06 Y:2024 06 2024 INSTALL OCCUPANCY SENSORS $1,551 $5,809 Not Implemented
UD1096 # 07 Y:2024 07 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $24,210 $242,106 Not Implemented
NL0102 # 01 Y:2024 01 2024 UPGRADE OBSOLETE EQUIPMENT $88,713 $315,000 n/a
NL0102 # 02 Y:2024 02 2024 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $21,171 $6,200 n/a
NL0102 # 03 Y:2024 03 2024 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $10,283 $250 n/a
NL0102 # 04 Y:2024 04 2024 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,253 $10,118 n/a
NL0102 # 05 Y:2024 05 2024 INSTALL SUB-METERING EQUIPMENT $1,237 $1,850 n/a
NL0102 # 06 Y:2024 06 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,130 $1,000 n/a
NL0102 # 07 Y:2024 07 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $882 $802 n/a
IC0315 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $82,148 $379,057 n/a