IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,718

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0096 # 09 Y:2005 09 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,250 $0 Implemented
IC0096 # 10 Y:2005 10 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $140 $430 Not Implemented
IC0096 # 11 Y:2005 11 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,209 $4,715 Implemented
IC0096 # 12 Y:2005 12 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,971 $34,362 Implemented
IC0096 # 13 Y:2005 13 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,009 $5,073 Not Implemented
IC0096 # 14 Y:2005 14 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $744 $781 Not Implemented
IC0095 # 01 Y:2005 01 2005 USE IMMERSION HEATING IN TANKS, MELTING POTS, ETC $30,106 $55,000 Not Implemented
IC0095 # 02 Y:2005 02 2005 MOVE BOILER TO MORE EFFICIENT LOCATION $47,879 $205,000 Not Implemented
IC0095 # 03 Y:2005 03 2005 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $116,731 $400,000 Not Implemented
IC0095 # 04 Y:2005 04 2005 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $16,405 $50,000 Not Implemented
IC0095 # 05 Y:2005 05 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,441 $0 Implemented
IC0095 # 06 Y:2005 06 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $9,852 $9,142 Implemented
IC0095 # 07 Y:2005 07 2005 REPAIR AND ELIMINATE STEAM LEAKS $1,812 $2,700 Implemented
IC0095 # 08 Y:2005 08 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $716 $992 Implemented
IC0095 # 09 Y:2005 09 2005 RECOVER WASTE HEAT FROM EQUIPMENT $6,010 $3,168 Not Implemented
IC0095 # 10 Y:2005 10 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,367 $1,200 Implemented
IC0095 # 11 Y:2005 11 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $2,515 $0 Implemented
IC0095 # 12 Y:2005 12 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,034 $1,400 Not Implemented
IC0095 # 13 Y:2005 13 2005 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $5,283 $24,720 Not Implemented
BD0281 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,944 $7,408 Not Implemented
BD0281 # 02 Y:2005 02 2005 USE RADIANT HEATER FOR SPOT HEATING $7,491 $6,000 Not Implemented
BD0281 # 03 Y:2005 03 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,406 $0 Not Implemented
BD0281 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,725 $200 Not Implemented
BD0281 # 05 Y:2005 05 2005 INSTALL OCCUPANCY SENSORS $1,418 $675 Not Implemented
BD0281 # 06 Y:2005 06 2005 SHUT OFF PILOTS IN STANDBY EQUIPMENT $964 $0 Not Implemented