Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,996
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0525 # 05 Y:1997 | 05 | 1997 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $2,850 | $4,477 | Not Implemented |
OK0525 # 06 Y:1997 | 06 | 1997 | IMPROVE COMBUSTION CONTROL CAPABILITY | $1,033 | $2,805 | Not Implemented |
OK0525 # 07 Y:1997 | 07 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $147 | $278 | Not Implemented |
OK0525 # 08 Y:1997 | 08 | 1997 | INSTALL OCCUPANCY SENSORS | $134 | $116 | Implemented |
OK0525 # 09 Y:1997 | 09 | 1997 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $28,080 | $2,090 | Not Implemented |
AS0205 # 01 Y:1997 | 01 | 1997 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $11,182 | $2,080 | Implemented |
AS0205 # 02 Y:1997 | 02 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,290 | $7,006 | Not Implemented |
AS0205 # 03 Y:1997 | 03 | 1997 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $815 | $70 | Implemented |
AS0205 # 04 Y:1997 | 04 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,230 | $1,092 | Implemented |
AS0205 # 05 Y:1997 | 05 | 1997 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $8,943 | $7,500 | Not Implemented |
AS0205 # 06 Y:1997 | 06 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $714 | $40 | Implemented |
AS0205 # 07 Y:1997 | 07 | 1997 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,901 | $70 | Not Implemented |
AS0205 # 08 Y:1997 | 08 | 1997 | INSTALL OCCUPANCY SENSORS | $1,348 | $1,425 | Not Implemented |
AS0205 # 09 Y:1997 | 09 | 1997 | TREAT AND REUSE RINSE WATERS | $4,004 | $950 | Not Implemented |
AS0205 # 10 Y:1997 | 10 | 1997 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $15,110 | $4,500 | Not Implemented |
AS0205 # 11 Y:1997 | 11 | 1997 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $2,076 | $30 | Implemented |
AS0206 # 01 Y:1997 | 01 | 1997 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $10,800 | $7,000 | Not Implemented |
AS0206 # 02 Y:1997 | 02 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,330 | $220 | Implemented |
AS0206 # 03 Y:1997 | 03 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,393 | $2,503 | Not Implemented |
AS0206 # 04 Y:1997 | 04 | 1997 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,124 | $225 | Not Implemented |
AS0206 # 05 Y:1997 | 05 | 1997 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $377 | $60 | Implemented |
AS0206 # 06 Y:1997 | 06 | 1997 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $2,352 | $30 | Implemented |
AS0206 # 07 Y:1997 | 07 | 1997 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $1,760 | $0 | Not Implemented |
AS0206 # 08 Y:1997 | 08 | 1997 | DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS | $12,000 | $100 | Not Implemented |
AM0303 # 01 Y:1997 | 01 | 1997 | OPTIMIZE PLANT POWER FACTOR | $29,680 | $24,620 | Not Implemented |