IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,204

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0376 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,968 $27,399 Not Implemented
UF0376 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,222 $2,053 Not Implemented
UF0376 # 03 Y:2006 03 2006 ADD AREA LIGHTING SWITCHES $878 $2,646 Not Implemented
UF0376 # 04 Y:2006 04 2006 INSTALL BACK-UP EQUIPMENT $1,632,456 $5,315 Not Implemented
UF0376 # 05 Y:2006 05 2006 AIR CONDITION ONLY SPACE NECESSARY $1,014 $3,200 Not Implemented
UF0376 # 06 Y:2006 06 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $150 $1,480 Not Implemented
UF0376 # 07 Y:2006 07 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $369 $0 Not Implemented
UF0376 # 08 Y:2006 08 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $148 $0 Not Implemented
WV0335 # 01 Y:2006 01 2006 USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION $151,578 $97,142 Not Implemented
WV0335 # 02 Y:2006 02 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $127,911 $14,450 Implemented
WV0335 # 03 Y:2006 03 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,924 $250 Not Implemented
WV0335 # 04 Y:2006 04 2006 DEVELOP A REPAIR/REPLACE POLICY $6,057 $240 Implemented
WV0335 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,865 $1,420 Implemented
WV0335 # 06 Y:2006 06 2006 UTILIZE A LESS EXPENSIVE COOLING METHOD $2,785 $5,803 Implemented
WV0335 # 07 Y:2006 07 2006 BURN WASTE OIL FOR HEAT $1,494 $1,300 Not Implemented
WV0335 # 08 Y:2006 08 2006 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $985 $1,680 Implemented
WV0334 # 01 Y:2006 01 2006 USE RADIANT HEATER FOR SPOT HEATING $50,392 $80,000 Not Implemented
WV0334 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,971 $13,343 Implemented
WV0334 # 03 Y:2006 03 2006 OPTIMIZE PLANT POWER FACTOR $20,449 $12,020 Implemented
WV0334 # 04 Y:2006 04 2006 DEVELOP A REPAIR/REPLACE POLICY $11,461 $648 Implemented
WV0334 # 05 Y:2006 05 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,398 $350 Implemented
WV0334 # 06 Y:2006 06 2006 REDUCE VENTILATION AIR $3,560 $892 Implemented
WV0334 # 07 Y:2006 07 2006 INSTALL OCCUPANCY SENSORS $2,103 $473 Implemented
WV0334 # 08 Y:2006 08 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,543 $650 Implemented
WV0334 # 09 Y:2006 09 2006 UTILIZE A LESS EXPENSIVE COOLING METHOD $1,275 $2,748 Implemented