IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,485

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NL0028 # 03 Y:2019 03 2019 INSULATE BARE EQUIPMENT $3,028 $4,631 Implemented
NL0028 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,582 $1,600 Implemented
NL0028 # 05 Y:2019 05 2019 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $132 $474 Not Implemented
OK1002 # 01 Y:2019 01 2019 OPTIMIZE PLANT POWER FACTOR $20,293 $28,306 Not Implemented
OK1002 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,343 $2,609 Implemented
OK1002 # 03 Y:2019 03 2019 RECOVER WASTE HEAT FROM EQUIPMENT $2,400 $2,933 Implemented
OK1002 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,768 $3,646 Implemented
OK1002 # 05 Y:2019 05 2019 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $191,600 $806,420 Not Implemented
OK1002 # 06 Y:2019 06 2019 INSTALL SET-BACK TIMERS $1,083 $802 Implemented
OK1002 # 07 Y:2019 07 2019 USE RADIANT HEATER FOR SPOT HEATING $39,703 $37,000 Not Implemented
AM0772 # 01 Y:2019 01 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $18,306 $1,100 Implemented
AM0772 # 02 Y:2019 02 2019 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $27,900 $10,000 Implemented
AM0772 # 03 Y:2019 03 2019 OPTIMIZE PLANT POWER FACTOR $10,709 $23,380 Not Implemented
AM0772 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,435 $20 Implemented
AM0772 # 05 Y:2019 05 2019 RECOVER WASTE HEAT FROM EQUIPMENT $2,191 $3,010 Not Implemented
AM0772 # 06 Y:2019 06 2019 PAY UTILITY BILLS ON TIME $3,642 $0 Implemented
AM0772 # 07 Y:2019 07 2019 INSTALL OCCUPANCY SENSORS $365 $770 Implemented
AM0772 # 08 Y:2019 08 2019 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $650 $900 Implemented
AM0772 # 09 Y:2019 09 2019 USE SYNTHETIC LUBRICANT $387 $160 Not Implemented
TT0218 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,090 $85,313 Implemented
TT0218 # 02 Y:2019 02 2019 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $21,004 $2,150 Implemented
TT0218 # 03 Y:2019 03 2019 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $20,902 $30,000 Not Implemented
TT0218 # 04 Y:2019 04 2019 UPGRADE CONTROLS ON COMPRESSORS $20,301 $8,000 Not Implemented
TT0218 # 05 Y:2019 05 2019 INCREASE AMOUNT OF CONDENSATE RETURNED $5,090 $15,000 Implemented
TT0218 # 06 Y:2019 06 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $3,670 $200 Implemented