IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,289

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0154 # 01 Y:1998 01 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,913 $15,000 n/a
NC0154 # 02 Y:1998 02 1998 CLOSE OFF UNNEEDED STEAM LINES $2,893 $3,000 n/a
NC0154 # 03 Y:1998 03 1998 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $2,295 $825 n/a
NC0154 # 04 Y:1998 04 1998 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $1,693 $5,000 n/a
NC0154 # 05 Y:1998 05 1998 TURN OFF EQUIPMENT WHEN NOT IN USE $1,140 $0 n/a
NC0154 # 06 Y:1998 06 1998 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $3,876 $1,500 n/a
NC0154 # 07 Y:1998 07 1998 USE ADSORPTION, ION EXCHANGE TO REMOVE CONTAMINANTS $62,900 $5,500 n/a
NC0154 # 08 Y:1998 08 1998 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $520,000 $0 n/a
NC0141 # 01 Y:1998 01 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $556 $60 Implemented
NC0141 # 02 Y:1998 02 1998 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $5,943 $10,000 Implemented
NC0141 # 03 Y:1998 03 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,183 $4,236 Implemented
NC0141 # 04 Y:1998 04 1998 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $31,048 $4,000 Implemented
NC0141 # 05 Y:1998 05 1998 INSTALL TURBULATORS $11,553 $3,500 Not Implemented
NC0141 # 06 Y:1998 06 1998 BURN A LESS EXPENSIVE GRADE OF FUEL $6,874 $0 Not Implemented
NC0141 # 07 Y:1998 07 1998 ELIMINATE LEAKS IN WATER LINES AND VALVES $1,861 $200 Implemented
NC0141 # 08 Y:1998 08 1998 USE ADSORPTION, ION EXCHANGE TO REMOVE CONTAMINANTS $124,752 $270,000 Not Implemented
NC0141 # 09 Y:1998 09 1998 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE $22,000 $67,000 Not Implemented
NC0141 # 10 Y:1998 10 1998 INSTALL EQUIPMENT TO MOVE PRODUCT $14,000 $50,000 Not Implemented
TN0646 # 01 Y:1998 01 1998 REPROCESS SPENT OILS ON SITE FOR RE-USE $603,410 $51,350 Implemented
TN0646 # 02 Y:1998 02 1998 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $28,800 $21,900 Implemented
TN0646 # 03 Y:1998 03 1998 ADD AREA LIGHTING SWITCHES $8,900 $13,600 Implemented
TN0646 # 04 Y:1998 04 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,325 $5,000 Implemented
TN0646 # 05 Y:1998 05 1998 CONTRACT A WOOD PALLET RECYCLING COMPANY $2,880 $0 Implemented
TN0646 # 06 Y:1998 06 1998 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,600 $0 Not Implemented
NC0151 # 01 Y:1998 01 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,157 $600 Not Implemented