Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,942
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0847 # 05 Y:2012 | 05 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,953 | $1,500 | Not Implemented |
UD0847 # 06 Y:2012 | 06 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $590 | $500 | Not Implemented |
UD0847 # 07 Y:2012 | 07 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $157 | $1,000 | Not Implemented |
UD0847 # 08 Y:2012 | 08 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,162 | $0 | Not Implemented |
UD0847 # 09 Y:2012 | 09 | 2012 | INSULATE BARE EQUIPMENT | $175 | $200 | Not Implemented |
UD0847 # 10 Y:2012 | 10 | 2012 | REDUCE VENTILATION AIR | $9,297 | $11,500 | Not Implemented |
UD0847 # 11 Y:2012 | 11 | 2012 | REDUCE VENTILATION AIR | $5,243 | $0 | Implemented |
UD0847 # 12 Y:2012 | 12 | 2012 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,403 | $22,015 | Implemented |
UD0846 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,212 | $2,054 | Implemented |
UD0846 # 02 Y:2012 | 02 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,542 | $0 | Not Implemented |
UD0846 # 03 Y:2012 | 03 | 2012 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,567 | $0 | Implemented |
UD0846 # 04 Y:2012 | 04 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,577 | $2,000 | Not Implemented |
UD0846 # 05 Y:2012 | 05 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $601 | $1,000 | Implemented |
UD0846 # 06 Y:2012 | 06 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,109 | $1,000 | Not Implemented |
UD0846 # 07 Y:2012 | 07 | 2012 | INSULATE BARE EQUIPMENT | $249 | $593 | Not Implemented |
UD0846 # 08 Y:2012 | 08 | 2012 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $11,712 | $38,000 | Implemented |
UD0846 # 09 Y:2012 | 09 | 2012 | REDUCE VENTILATION AIR | $5,608 | $9,000 | Not Implemented |
UD0846 # 10 Y:2012 | 10 | 2012 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,694 | $0 | Not Implemented |
UD0845 # 01 Y:2011 | 01 | 2011 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,244 | $500 | Not Implemented |
UD0845 # 02 Y:2011 | 02 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $534 | $0 | Implemented |
UD0845 # 03 Y:2011 | 03 | 2011 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $4,285 | $4,000 | Implemented |
UD0845 # 04 Y:2011 | 04 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $286 | $1,500 | Not Implemented |
UD0845 # 05 Y:2011 | 05 | 2011 | REDUCE HEAT GAIN BY WINDOW TINTING | $533 | $0 | Not Implemented |
UD0844 # 01 Y:2011 | 01 | 2011 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $170,257 | $280,000 | Not Implemented |
UD0844 # 02 Y:2011 | 02 | 2011 | USE REACTIVE RINSING | $70,989 | $30,000 | Not Implemented |