Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,644

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0236 # 01 Y:2006 01 2006 REDESIGN PROCESS $328,340 $1,000,000 Not Implemented
LE0236 # 02 Y:2006 02 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $123,125 $25,000 Not Implemented
LE0236 # 03 Y:2006 03 2006 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $23,441 $17,600 Not Implemented
LE0236 # 04 Y:2006 04 2006 OPTIMIZE PLANT POWER FACTOR $22,758 $42,650 Not Implemented
LE0236 # 05 Y:2006 05 2006 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $15,083 $2,500 Implemented
LE0236 # 06 Y:2006 06 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,063 $2,750 Not Implemented
LE0236 # 07 Y:2006 07 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,742 $300 Not Implemented
LE0236 # 08 Y:2006 08 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,686 $300 Not Implemented
LE0236 # 09 Y:2006 09 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,309 $700 Not Implemented
LE0235 # 01 Y:2006 01 2006 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $1,380,000 $3,000,000 Not Implemented
LE0235 # 02 Y:2006 02 2006 PREHEAT COMBUSTION AIR WITH WASTE HEAT $202,503 $95,000 Implemented
LE0235 # 03 Y:2006 03 2006 UPGRADE OBSOLETE EQUIPMENT $192,971 $250,000 Implemented
LE0235 # 04 Y:2006 04 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $73,559 $36,000 Not Implemented
LE0235 # 05 Y:2006 05 2006 ADJUST BURNERS FOR EFFICIENT OPERATION $66,844 $100 Implemented
LE0235 # 06 Y:2006 06 2006 ADJUST BURNERS FOR EFFICIENT OPERATION $63,349 $20,000 Implemented
LE0235 # 07 Y:2006 07 2006 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $22,786 $30,000 Implemented
LE0235 # 08 Y:2006 08 2006 REDESIGN PROCESS $19,713 $1,000 Not Implemented
LE0235 # 09 Y:2006 09 2006 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $12,444 $6,000 Implemented
LE0235 # 10 Y:2006 10 2006 PREHEAT COMBUSTION AIR WITH WASTE HEAT $11,211 $15,000 Not Implemented
LE0235 # 11 Y:2006 11 2006 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $9,908 $7,500 Implemented
LE0235 # 12 Y:2006 12 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,006 $1,000 Implemented
LE0233 # 01 Y:2006 01 2006 USE OPTIMUM THICKNESS INSULATION $44,800 $14,036 Not Implemented
LE0233 # 02 Y:2006 02 2006 INSULATE BARE EQUIPMENT $19,283 $17,728 Not Implemented
LE0233 # 03 Y:2006 03 2006 INSTALL TIMERS AND/OR THERMOSTATS $8,534 $2,100 Not Implemented
LE0233 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,332 $800 Implemented