IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,520

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NV0130 # 03 Y:1999 03 1999 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,864 $970 Not Implemented
WI0349 # 01 Y:1999 01 1999 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $7,513 $500 Not Implemented
WI0349 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,254 $25,528 Not Implemented
WI0349 # 03 Y:1999 03 1999 INSTALL TIMERS AND/OR THERMOSTATS $2,784 $800 Implemented
WI0349 # 04 Y:1999 04 1999 INSTALL / REPAIR INSULATION ON STEAM LINES $2,309 $306 Not Implemented
WI0349 # 05 Y:1999 05 1999 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,927 $500 Implemented
WI0349 # 06 Y:1999 06 1999 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,918 $0 Not Implemented
WI0349 # 07 Y:1999 07 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,649 $0 Implemented
WI0349 # 08 Y:1999 08 1999 COMBINE UTILITY METERS $356 $200 Not Implemented
WI0349 # 09 Y:1999 09 1999 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $341 $682 Not Implemented
UF0228 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,851 $0 Not Implemented
UF0228 # 02 Y:1999 02 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,958 $0 Not Implemented
UF0228 # 03 Y:1999 03 1999 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $9,888 $50 Implemented
UF0228 # 04 Y:1999 04 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,660 $955 Not Implemented
UF0228 # 05 Y:1999 05 1999 INSTALL EQUIPMENT TO MOVE PRODUCT $274,473 $22,390 Not Implemented
UF0228 # 06 Y:1999 06 1999 HIRE ADDITIONAL PERSONNEL TO REDUCE CHANGEOUT TIME $57,600 $1,090,000 Implemented
MA0440 # 01 Y:1999 01 1999 CHANGE OPERATING CONDITIONS $29,415 $130,900 Not Implemented
MA0440 # 02 Y:1999 02 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,896 $15,790 Implemented
MA0440 # 03 Y:1999 03 1999 CHANGE OPERATING CONDITIONS $2,562 $27,140 Not Implemented
MA0440 # 04 Y:1999 04 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,444 $3,400 Implemented
MA0440 # 05 Y:1999 05 1999 RECOVER WASTE HEAT FROM EQUIPMENT $3,278 $5,204 Implemented
MA0440 # 06 Y:1999 06 1999 RECOVER WASTE HEAT FROM EQUIPMENT $12,349 $70,000 Not Implemented
MA0440 # 07 Y:1999 07 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $709 $1,245 Implemented
MA0440 # 08 Y:1999 08 1999 MINIMIZE WATER USAGE $6,136 $10,000 Not Implemented
AS0252 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,350 $16,625 Not Implemented