Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,302
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0262 # 05 Y:2008 | 05 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,882 | $5,215 | Implemented |
SU0262 # 06 Y:2008 | 06 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $338 | $577 | Not Implemented |
SU0262 # 07 Y:2008 | 07 | 2008 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $183 | $308 | Not Implemented |
SU0262 # 08 Y:2008 | 08 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,400 | $10,328 | Implemented |
AM0538 # 01 Y:2008 | 01 | 2008 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $192,300 | $174,034 | Not Implemented |
AM0538 # 02 Y:2008 | 02 | 2008 | REPAIR AND ELIMINATE STEAM LEAKS | $171,000 | $5,000 | Implemented |
AM0538 # 03 Y:2008 | 03 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $41,905 | $105,000 | Implemented |
AM0538 # 04 Y:2008 | 04 | 2008 | REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT | $2,200,000 | $6,600,000 | Implemented |
AM0538 # 05 Y:2008 | 05 | 2008 | INCREASE AMOUNT OF CONDENSATE RETURNED | $9,200 | $0 | Not Implemented |
AM0538 # 06 Y:2008 | 06 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,770 | $1,120 | Implemented |
AM0538 # 07 Y:2008 | 07 | 2008 | USE SYNTHETIC LUBRICANT | $1,045 | $0 | Not Implemented |
SU0262 # 09 Y:2008 | 09 | 2008 | INSTALL OCCUPANCY SENSORS | $320 | $716 | Not Implemented |
NC0371 # 01 Y:2008 | 01 | 2008 | REPLACE ELECTRIC REHEAT WITH HEAT PIPES | $215,106 | $219,000 | Not Implemented |
NC0371 # 02 Y:2008 | 02 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $444 | $100 | Implemented |
NC0371 # 03 Y:2008 | 03 | 2008 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $15,277 | $17,280 | Implemented |
NC0371 # 04 Y:2008 | 04 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,923 | $4,350 | Not Implemented |
NC0371 # 05 Y:2008 | 05 | 2008 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $2,415 | $2,000 | Not Implemented |
NC0371 # 06 Y:2008 | 06 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,037 | $2,000 | Not Implemented |
NC0371 # 07 Y:2008 | 07 | 2008 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $2,143 | $10,000 | Not Implemented |
NC0371 # 08 Y:2008 | 08 | 2008 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $998 | $0 | Not Implemented |
NC0371 # 09 Y:2008 | 09 | 2008 | INSULATE BARE EQUIPMENT | $288 | $485 | Implemented |
NC0371 # 10 Y:2008 | 10 | 2008 | ADOPT IN-HOUSE MATERIAL GENERATION | $28,534 | $85,000 | Not Implemented |
NC0371 # 11 Y:2008 | 11 | 2008 | DEVELOP A REPAIR/REPLACE POLICY | $5,688 | $13,149 | Not Implemented |
OR0527 # 01 Y:2008 | 01 | 2008 | $102,600 | $32,700 | Not Implemented | |
OR0527 # 02 Y:2008 | 02 | 2008 | $12,200 | $77,700 | Not Implemented |