IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,302

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0262 # 05 Y:2008 05 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,882 $5,215 Implemented
SU0262 # 06 Y:2008 06 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $338 $577 Not Implemented
SU0262 # 07 Y:2008 07 2008 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $183 $308 Not Implemented
SU0262 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,400 $10,328 Implemented
AM0538 # 01 Y:2008 01 2008 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $192,300 $174,034 Not Implemented
AM0538 # 02 Y:2008 02 2008 REPAIR AND ELIMINATE STEAM LEAKS $171,000 $5,000 Implemented
AM0538 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,905 $105,000 Implemented
AM0538 # 04 Y:2008 04 2008 REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT $2,200,000 $6,600,000 Implemented
AM0538 # 05 Y:2008 05 2008 INCREASE AMOUNT OF CONDENSATE RETURNED $9,200 $0 Not Implemented
AM0538 # 06 Y:2008 06 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $1,770 $1,120 Implemented
AM0538 # 07 Y:2008 07 2008 USE SYNTHETIC LUBRICANT $1,045 $0 Not Implemented
SU0262 # 09 Y:2008 09 2008 INSTALL OCCUPANCY SENSORS $320 $716 Not Implemented
NC0371 # 01 Y:2008 01 2008 REPLACE ELECTRIC REHEAT WITH HEAT PIPES $215,106 $219,000 Not Implemented
NC0371 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $444 $100 Implemented
NC0371 # 03 Y:2008 03 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $15,277 $17,280 Implemented
NC0371 # 04 Y:2008 04 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,923 $4,350 Not Implemented
NC0371 # 05 Y:2008 05 2008 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,415 $2,000 Not Implemented
NC0371 # 06 Y:2008 06 2008 RECOVER WASTE HEAT FROM EQUIPMENT $3,037 $2,000 Not Implemented
NC0371 # 07 Y:2008 07 2008 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $2,143 $10,000 Not Implemented
NC0371 # 08 Y:2008 08 2008 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $998 $0 Not Implemented
NC0371 # 09 Y:2008 09 2008 INSULATE BARE EQUIPMENT $288 $485 Implemented
NC0371 # 10 Y:2008 10 2008 ADOPT IN-HOUSE MATERIAL GENERATION $28,534 $85,000 Not Implemented
NC0371 # 11 Y:2008 11 2008 DEVELOP A REPAIR/REPLACE POLICY $5,688 $13,149 Not Implemented
OR0527 # 01 Y:2008 01 2008 $102,600 $32,700 Not Implemented
OR0527 # 02 Y:2008 02 2008 $12,200 $77,700 Not Implemented