IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

140,132

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0601 # 05 Y:2017 05 2017 INSULATE FEEDWATER TANK $792 $750 Not Implemented
NC0601 # 06 Y:2017 06 2017 RECOVER WASTE HEAT FROM EQUIPMENT $15,825 $82,000 Not Implemented
NC0601 # 07 Y:2017 07 2017 ADOPT IN-HOUSE MATERIAL GENERATION $21,773 $20,000 Not Implemented
NC0601 # 08 Y:2017 08 2017 INSTALL OCCUPANCY SENSORS $217 $487 Not Implemented
NC0601 # 09 Y:2017 09 2017 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $2,876 $30 Not Implemented
UK1709 # 06 Y:2017 06 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,910 $0 Not Implemented
UK1709 # 07 Y:2017 07 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,536 $0 Not Implemented
UK1709 # 08 Y:2017 08 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,908 $0 Not Implemented
UK1709 # 09 Y:2017 09 2017 USE ONLY CERTIFIED MOTOR REPAIR SHOPS $1,400 $2,734 Not Implemented
UK1709 # 10 Y:2017 10 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,596 $2,983 Not Implemented
UK1709 # 11 Y:2017 11 2017 INSTALL SPECTRAL REFLECTORS / DELAMP $1,368 $113 Not Implemented
UK1709 # 12 Y:2017 12 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,293 $1,481 Not Implemented
UK1709 # 13 Y:2017 13 2017 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $941 $1,492 Not Implemented
UK1709 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,732 $2,100 Not Implemented
UK1709 # 02 Y:2017 02 2017 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING $1,143 $0 Not Implemented
UK1709 # 03 Y:2017 03 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,114 $453 Not Implemented
UK1709 # 04 Y:2017 04 2017 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $338 $0 Not Implemented
UK1709 # 05 Y:2017 05 2017 PREHEAT COMBUSTION AIR WITH WASTE HEAT $5,407 $3,304 Not Implemented
MZ0240 # 01 Y:2017 01 2017 RECOVER WASTE HEAT FROM EQUIPMENT $7,020 $6,000 Implemented
MZ0240 # 02 Y:2017 02 2017 INSTALL OCCUPANCY SENSORS $8,183 $2,100 Implemented
MZ0240 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,206 $250 Implemented
MZ0240 # 04 Y:2017 04 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $806 $5,500 Not Implemented
MZ0240 # 05 Y:2017 05 2017 INSTALL FLOATING COVERS ON TANKS OF VOLATILE MATERIALS TO REDUCE EVAPORATION $7,139 $5,400 Implemented
MZ0240 # 06 Y:2017 06 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,745 $1,160 Implemented
MZ0240 # 07 Y:2017 07 2017 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $119,328 $208,000 Implemented