IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,105

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0669 # 12 Y:2003 12 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $2,847 $1,754 Not Implemented
UD0669 # 13 Y:2003 13 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,888 $6,450 Implemented
UD0669 # 14 Y:2003 14 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,679 $142 Implemented
UD0669 # 15 Y:2003 15 2003 INSTALL OCCUPANCY SENSORS $1,622 $177 Not Implemented
UD0669 # 16 Y:2003 16 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $568 $1,026 Implemented
UD0669 # 17 Y:2003 17 2003 UPGRADE CONTROLS ON COMPRESSORS $350 $1,168 Not Implemented
WI0443 # 01 Y:2003 01 2003 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $3,583 $9,000 Implemented
WI0443 # 02 Y:2003 02 2003 REDUCE EXCESSIVE BOILER BLOWDOWN $1,964 $4,500 Implemented
WI0443 # 03 Y:2003 03 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,215 $500 Implemented
WI0443 # 04 Y:2003 04 2003 INSTALL OCCUPANCY SENSORS $843 $2,500 Not Implemented
WI0443 # 05 Y:2003 05 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $421 $640 Implemented
WI0443 # 06 Y:2003 06 2003 INSTALL OCCUPANCY SENSORS $341 $75 Implemented
UM0232 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,492 $5,655 Not Implemented
UM0232 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $42,683 $2,100 Implemented
UM0232 # 03 Y:2003 03 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,416 $10,600 Not Implemented
UM0232 # 04 Y:2003 04 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,706 $1,660 Not Implemented
UM0232 # 05 Y:2003 05 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $13,693 $1,000 Implemented
UM0232 # 06 Y:2003 06 2003 INSTALL COMMON HEADER ON COMPRESSORS $13,700 $6,480 Implemented
LM0056 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,587 $690 Implemented
LM0056 # 02 Y:2003 02 2003 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $7,713 $0 Implemented
LM0056 # 03 Y:2003 03 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,371 $1,200 Not Implemented
LM0056 # 04 Y:2003 04 2003 $300,000 $5,000 Not Implemented
LM0056 # 05 Y:2003 05 2003 $450,000 $20,000 n/a
LM0056 # 06 Y:2003 06 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,754 $1,968 Not Implemented
LM0056 # 07 Y:2003 07 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,330 $6,675 Not Implemented