IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,230

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0062 # 10 Y:2011 10 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $19,502 $30,000 Not Implemented
MZ0062 # 11 Y:2011 11 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $17,836 $10,000 Implemented
MZ0062 # 12 Y:2011 12 2011 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $62 $60 Not Implemented
MZ0062 # 13 Y:2011 13 2011 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $91 $300 Implemented
MZ0062 # 14 Y:2011 14 2011 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $11,657 $150,000 Implemented
MZ0062 # 15 Y:2011 15 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,598 $1,500 Not Implemented
MZ0062 # 16 Y:2011 16 2011 UPGRADE CONTROLS ON COMPRESSORS $11,500 $18,000 Implemented
OR0565 # 01 Y:2011 01 2011 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $14,900 $9,340 Implemented
OR0565 # 02 Y:2011 02 2011 INSULATE BARE EQUIPMENT $6,110 $21,715 Implemented
OR0565 # 03 Y:2011 03 2011 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $10,300 $17,700 Implemented
OR0565 # 04 Y:2011 04 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,820 $19,210 Not Implemented
OR0565 # 05 Y:2011 05 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,900 $10,900 Implemented
OR0565 # 06 Y:2011 06 2011 HEAT WATER WITH EXHAUST HEAT $77,370 $96,750 Implemented
OR0565 # 07 Y:2011 07 2011 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $434 $1,877 Not Implemented
AM0589 # 01 Y:2011 01 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $21,960 $90 Implemented
AM0589 # 02 Y:2011 02 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,080 $23 Implemented
AM0589 # 03 Y:2011 03 2011 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $5,251 $0 Implemented
AM0589 # 04 Y:2011 04 2011 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $4,230 $370 Implemented
AM0589 # 05 Y:2011 05 2011 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,885 $0 Not Implemented
AM0589 # 06 Y:2011 06 2011 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,575 $0 Implemented
AM0589 # 07 Y:2011 07 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $205 $225 Implemented
AM0589 # 08 Y:2011 08 2011 PAY UTILITY BILLS ON TIME $236 $0 Implemented
SU0301 # 01 Y:2011 01 2011 USE POWER DURING OFF-PEAK PERIODS $4,632 $0 Not Implemented
SU0301 # 02 Y:2011 02 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,978 $689 Not Implemented
SU0301 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $2,477 $2,028 Implemented