Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,715
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0166 # 10 Y:2016 | 10 | 2016 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $138 | $120 | Implemented |
MZ0204 # 01 Y:2016 | 01 | 2016 | INSTALL OCCUPANCY SENSORS | $3,536 | $1,500 | Implemented |
MZ0204 # 02 Y:2016 | 02 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,259 | $37,722 | Implemented |
MZ0204 # 03 Y:2016 | 03 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,678 | $1,200 | Implemented |
MZ0204 # 04 Y:2016 | 04 | 2016 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $266 | $0 | Not Implemented |
MZ0204 # 05 Y:2016 | 05 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,246 | $1,212 | Implemented |
SU0406 # 01 Y:2016 | 01 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,885 | $0 | Implemented |
SU0406 # 02 Y:2016 | 02 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,714 | $0 | Implemented |
SU0406 # 03 Y:2016 | 03 | 2016 | ELIMINATE/REDUCE AN OPERATION | $3,795 | $1,535 | Not Implemented |
SU0406 # 04 Y:2016 | 04 | 2016 | INSTALL / REPAIR INSULATION ON STEAM LINES | $644 | $337 | Implemented |
SU0406 # 05 Y:2016 | 05 | 2016 | INSTALL OCCUPANCY SENSORS | $126 | $145 | Implemented |
SU0406 # 06 Y:2016 | 06 | 2016 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $226 | $287 | Implemented |
SU0406 # 07 Y:2016 | 07 | 2016 | REPLACE BOILER | $8,344 | $37,133 | Implemented |
IP0058 # 01 Y:2016 | 01 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,007 | $326 | Not Implemented |
IP0058 # 02 Y:2016 | 02 | 2016 | INSTALL OCCUPANCY SENSORS | $256 | $51 | Not Implemented |
IP0058 # 03 Y:2016 | 03 | 2016 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $30,281 | $6,819 | Not Implemented |
IP0058 # 04 Y:2016 | 04 | 2016 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $11,137 | $4,626 | Not Implemented |
IP0058 # 05 Y:2016 | 05 | 2016 | USE MAGNETIC TECHNOLOGY TO TREAT WATER | $227 | $255 | Not Implemented |
IP0058 # 06 Y:2016 | 06 | 2016 | OPTIMIZE PLANT POWER FACTOR | $46,574 | $102,745 | Not Implemented |
LE0412 # 01 Y:2016 | 01 | 2016 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $13,984 | $20,000 | Not Implemented |
LE0412 # 02 Y:2016 | 02 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,397 | $8,050 | Implemented |
LE0412 # 03 Y:2016 | 03 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,688 | $19,250 | Implemented |
LE0412 # 04 Y:2016 | 04 | 2016 | INSTALL / REPAIR INSULATION ON STEAM LINES | $462 | $1,382 | Implemented |
LE0412 # 05 Y:2016 | 05 | 2016 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $4,944 | $18,280 | Not Implemented |
LE0412 # 06 Y:2016 | 06 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,108 | $4,125 | Not Implemented |