Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,718
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0252 # 01 Y:2022 | 01 | 2022 | INSTALL OCCUPANCY SENSORS | $32,927 | $257 | Implemented |
UA0252 # 02 Y:2022 | 02 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,634 | $850 | Implemented |
UA0252 # 03 Y:2022 | 03 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $13,657 | $8,080 | Implemented |
WV0619 # 01 Y:2022 | 01 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $46,415 | $81,000 | Not Implemented |
WV0619 # 02 Y:2022 | 02 | 2022 | UPGRADE CONTROLS ON COMPRESSORS | $41,175 | $63,410 | Not Implemented |
WV0619 # 03 Y:2022 | 03 | 2022 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $31,971 | $11,460 | Not Implemented |
WV0619 # 04 Y:2022 | 04 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $25,562 | $534 | Implemented |
WV0619 # 05 Y:2022 | 05 | 2022 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $20,481 | $1,000 | Implemented |
WV0619 # 06 Y:2022 | 06 | 2022 | DEVELOP A REPAIR/REPLACE POLICY | $14,226 | $1,514 | Implemented |
WV0619 # 07 Y:2022 | 07 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,611 | $45,435 | Not Implemented |
WV0619 # 08 Y:2022 | 08 | 2022 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $11,821 | $43,746 | Not Implemented |
WV0619 # 09 Y:2022 | 09 | 2022 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $10,727 | $3,024 | Implemented |
WV0619 # 10 Y:2022 | 10 | 2022 | INSULATE BARE EQUIPMENT | $5,912 | $2,928 | Implemented |
UU0198 # 01 Y:2022 | 01 | 2022 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $13,222 | $12,000 | Implemented |
UU0198 # 02 Y:2022 | 02 | 2022 | REPLACE BOILER | $7,758 | $4,499 | Implemented |
UU0198 # 03 Y:2022 | 03 | 2022 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $5,828 | $12,000 | Implemented |
UU0198 # 04 Y:2022 | 04 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,182 | $17,630 | Implemented |
UU0198 # 05 Y:2022 | 05 | 2022 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,018 | $4,500 | Implemented |
WM0175 # 01 Y:2022 | 01 | 2022 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $941,741 | $1,060,000 | Not Implemented |
WM0175 # 02 Y:2022 | 02 | 2022 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $840,840 | $38,534 | Not Implemented |
WM0175 # 03 Y:2022 | 03 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $447,150 | $2,178,400 | Not Implemented |
WM0175 # 04 Y:2022 | 04 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $116,088 | $85,000 | Not Implemented |
WM0175 # 05 Y:2022 | 05 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $98,046 | $48,230 | Not Implemented |
WM0175 # 06 Y:2022 | 06 | 2022 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $6,473 | $0 | Not Implemented |
WV0618 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $22,096 | $10,131 | Not Implemented |